45
Model PH61
Operating Procedures
Closing Procedures
THIS PROCEDURE MUST BE COMPLETED
EVERY 14 DAYS.
FOLLOW YOUR LOCAL HEALTH CODES.
To disassemble the PH61, the following items will be
needed:
S
Two cleaning and sanitizing pails
S
Necessary brushes (provided with freezer)
S
Cleaning solution
S
Sanitizing solution
S
Clean, sanitized towels
S
Parts trays
Draining Product From the
Freezing Cylinder
Step 1
Cancel automatic operation by pressing the AUTO
key. (See Figure 73.)
Figure 73
Step 2
Remove the shake cup holder. Set it aside for
cleaning later with all parts.
Step 3
Remove the hopper cover and agitator. Take these
parts to the sink to wash, rinse and sanitize.
Step 4
With a pail under the door spout, press the WASH
and PUMP keys. Open the draw valve and start to
drain the product from the freezing cylinder and mix
hopper. (See Figure 74.)
Figure 74
Step 5
When the flow of product stops, press the WASH
and PUMP keys, cancelling the WASH and PUMP
modes, and close the draw valve.
Discard this
product.
(See Figure 75.)
Figure 75
Step 6
Remove the cotter pin, mix feed tube, pump clip and
the assembled air/mix pump. Place the parts into the
parts tray.
Step 7
Remove the syrup lines from the freezer door by
rotating the syrup line fittings and pulling out.
Содержание PH61
Страница 1: ...Model PH61 Heat Treatment Shake Freezer Operating Instructions 048119 M 7 31 07 ...
Страница 12: ...8 Model PH61 Operator Parts Identification Section 4 Operator Parts Identification PH61 Exploded View Figure 1 ...
Страница 14: ...10 Model PH61 Operator Parts Identification 091216 Beater and Door Assembly Figure 2 ...
Страница 77: ...PH61 044816 33 8 07 ...
Страница 78: ...PH61 044816 62 8 07 ...