30
Model PH61
Operating Procedures
Step 19
Snap the restrictor cap over the end of the door
spout. (See Figure 25.)
Figure 25
Step 20
Slide the long drip pan into the hole in the front
panel.
Step 21
Slide the short drip pan into the hole in the rear
panel.
Step 22
Install the front drip tray and splash shield under the
door spout. (See Figure 26.)
Figure 26
Mix Hopper Assembly
With the parts trays available:
Step 1
Inspect the rubber pump parts. O-rings and gasket
must be in 100% good condition for the pump and
entire machine to operate properly. The o-rings and
gasket cannot properly serve their intended function
if nicks, cuts, or holes in the material are present.
Replace any defective parts immediately and
discard the old.
Step 2
Assemble the piston. Slide the red o-ring into the
groove of the piston. DO NOT lubricate the o-ring.
(See Figure 27.)
Figure 27
Содержание PH61
Страница 1: ...Model PH61 Heat Treatment Shake Freezer Operating Instructions 048119 M 7 31 07 ...
Страница 12: ...8 Model PH61 Operator Parts Identification Section 4 Operator Parts Identification PH61 Exploded View Figure 1 ...
Страница 14: ...10 Model PH61 Operator Parts Identification 091216 Beater and Door Assembly Figure 2 ...
Страница 77: ...PH61 044816 33 8 07 ...
Страница 78: ...PH61 044816 62 8 07 ...