Table 7—Two Stage Heating with Single Stage Thermostat Using 2 Two Stage Furnaces

THERMOSTAT CONNECTIONS

CONTROL BOARD CONNECTION

ACTION

R

R

Power from control board to thermostat

W

W/W1

Starts L/H and R/H furnaces in low heat or high heat, as deter-

mined by L/H furnace control board*

* LHT switches must be in correct configuration

Table 8a—Two Stage Heating with Two Stage Thermostat Using 2 Two Stage Furnaces

THERMOSTAT CONNECTIONS

CONTROL BOARD CONNECTION

ACTION

R

R

Power from control board to thermostat

W1

W/W1

Starts both furnaces in low heat for first stage heating*

W2

W2

Starts both furnaces in high heat for second stage heating*

* LHT switches must be in correct configuration

Table 8b—Single Stage Cooling with Single Stage Thermostat Using 2 Single Stage A/C units

THERMOSTAT CONNECTIONS

CONTROL BOARD CONNECTION

ACTION

R

R

Power from control board to thermostat

Y

Y/Y2

Energizes accessory cooling relay to start both A/C units for

cooling

G

G

Starts both indoor fans on cooling speed (With Y/Y2 energized)

Dehum*

Dehum**

Reduces airflow in cooling mode from cooling speed to heating

speed when Dehum input is removed

* Do not remove ACRDJ from furnace control boards
** Dehum is not available on all thermostats or control boards

Table 8c—Two Stage Cooling with Two Stage Thermostat Using 2 Single Stage A/C units

THERMOSTAT CONNECTIONS

CONTROL BOARD CONNECTION

ACTION

R

R

Power from control board to thermostat

Y1

Y/Y2

Energizes accessory cooling relay to start L/H A/C for first stage

cooling

Y2

None

Thermostat Y2 wired directly to R/H accessory relay to start R/H

A/C

G

G

Starts both indoor fans on heating speed until Y/Y2 is energized

Dehum*

Dehum**

Reduces airflow in cooling mode from cooling speed to heating

speed when Dehum input is removed

* Do not remove ACRDJ from furnace control boards
** Dehum is not available on all thermostats or control boards

Table 8d—Continuous Fan Operation

THERMOSTAT CONNECTIONS

CONTROL BOARD CONNECTION

ACTION

R

R

Power from control board to thermostat

G

G

Starts both fans in heating speed*

*Staged Continuous Fan operation is not available

© 2005 CAC/BDP

7310 W. Morris St., Indianapolis, IN 46231

—40—

Catalog No. AG-GATW-15

Содержание KGATW0601HSI

Страница 1: ...ctrical Supply Connections 34 Start Up and Adjustment 34 Sequence of Operation 36 Fixed Capacity Furnaces 36 SAFETY CONSIDERATIONS Installing and servicing of heating equipment can be hazardous due to...

Страница 2: ...should be at least as high upflow downflow or as long horizontal as the width of one furnace Supply air dampers when used should be installed in the branch ducts not in the common plenum Fire or smoke...

Страница 3: ...furnace Example 2 8 MIN Common Return Air Plenum Return Air Plenum Return Air Plenum Twinned Furnace Common Supply Air Plenum Fig 2 Downflow Horizontal Ductwork Connections A02224 A A A A A A Common...

Страница 4: ...r installed and uninstalled ungrounded furnaces 6 Before removing a new control from its container discharge your body s electrostatic charge to ground to protect the control from damage If the contro...

Страница 5: ...imit switch cycling will occur 4 Remove bottom closure panels from both furnaces See Fig 4 a Lay furnaces on back or sides b Remove 2 screws from bottom front panel c Rotate front panel downward to re...

Страница 6: ...e top of discharge opening and through both furnaces See Fig 6 Drill two 1 8 in holes approximately 1 in below return air flange from inside top of return air opening and through both furnaces See Fig...

Страница 7: ...strips equal distance from top and bottom as shown in Fig 5 Trim off excess material 6 Determine which side of furnace will be used to route external extension harness Remove 7 8 in diameter accessor...

Страница 8: ...onal support along the bottom of the rafter or joist Consult local or regional building codes for design and loading requirements For suspended installations See Fig 8b Not recommended for wood trusse...

Страница 9: ...e d Remove bottom closure panel and set aside for possible use as roll out protection e Reinstall bottom front panel f Stand furnaces upright Fig 8b Suspended Installation for Horizontal Furnaces Back...

Страница 10: ...in the horizontal position consideration must be made to the type of building construction Attic floors should be constructed to support normal live and dead loads of the furnaces and the person s se...

Страница 11: ...r compartment and through both furnaces See Fig 7 10 Drive 1 factory supplied screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces 11 Connect...

Страница 12: ...e blower compartment d Install the lock nuts on the 90 conduit connectors e Install 2 kit supplied straps approximately 18 inches from each end of harness Single Stage Heat with Single Stage Gas Heat...

Страница 13: ...econdary Harness includes the Auxiliary Door Switch and Auxiliary Limit Switch The harness is also tagged Secondary Furnace near the plug ends of the harness a Connect red wire labeled R Secondary to...

Страница 14: ...s 7 Dress wires to ensure they do not contact sharp or moving parts nor interfere with blower operation removal of filters or operation of switches 8 Make all thermostat connections to LH furnace only...

Страница 15: ...by side only 2 harness assemblies are required If the furnaces are installed back to back all 3 harness assemblies included in the kit must be used 1 Remove outer doors and blower access doors from bo...

Страница 16: ...harness on R H furnace The Secondary Harness includes the Auxiliary Door Switch and Auxiliary Limit Switch The harness is also tagged Secondary Furnace near the plug ends of the harness a Connect red...

Страница 17: ...nnect any connection other than supply and return air ducts Furnaces are recommended to be provided with a single shutoff valve However individual shutoff valves may be required by local codes or juri...

Страница 18: ...C Y OUTDOOR UNIT NO 2 LEGEND NOTES Y G W R COM NOTE 3 NOTE 6 327893 101 REV A 1 ALS S and ILK 1 are located in the SECONDARY or RH furnace blower compartment 2 Primary connections of transformer not...

Страница 19: ...L2 NOTE 2 PR1 MAKE NO THERMOSTAT CONNECTIONS TO SECONDARY OR RH FURNACE 1 2 ORN BLU RED EXTENSION HARNESS IF USED PLA 1 2 ORN BLU ILK 1 ALS S NOTE 1 ORN NOTE 3 24 VAC TRANSFORMER FIELD SUPPLIED NOTE 4...

Страница 20: ...ENSION HARNESS IF USED PLA 1 2 ORN BLU ILK 1 ALS S NOTE 1 ORN NOTE 3 24 VAC TRANSFORMER FIELD SUPPLIED NOTE 4 115 VAC C Y OUTDOOR UNIT NO 1 C Y OUTDOOR UNIT NO 2 ACRDJ AIR CONDITIONINGRELAY DISABLE JU...

Страница 21: ...beled TEST from LH furnace control TEST TWIN terminal After removing yellow wire component test can be initiated on each furnace individually as stated in Installation Start Up and Operating Instructi...

Страница 22: ...ultipoise units can be installed in UPFLOW DOWNFLOW or HORIZONTAL configurations A Upflow Downflow Side By Side Configuration Refer to Fig 20 for appearance and dimensional drawing of twinned furnaces...

Страница 23: ...tructions for details on optimum speed selection 10 Factory connected when BVSS Chimney Adapter Accessory Kit is not installed 11 Factory connected when LGPS is not used 12 Ignition lockout will occur...

Страница 24: ...INTERLOCK SWITCH SPST N O JB JUNCTION BOX LED LIGHT EMITTING DIODE FOR STATUS CODES AMBER LGPS LOW GAS PRESSURE SWITCH SPST N O LPS LOW HEAT PRESSURE SWITCH SPST N O LS 1 2 LIMIT SWITCH AUTO RESET SPS...

Страница 25: ...tighten until furnaces are secure and foam strips have sealed gap between furnaces Fig 20 Dimensional Drawing for Twinned Single Speed Condensing Furnaces Upflow Downflow A93537 17 5 16 24 1 2 27 1 2...

Страница 26: ...e from inside top of return air opening and through both furnaces See Fig 25 Fig 21 Back to Back Upflow Downflow or Horizontal A02234 Table 4 Dimensions INPUT HEATING SIZE BTUH NOMINAL COOLING SIZE A...

Страница 27: ...eath DO NOT use the back of the furnace for return air duct connections as limit cycling will occur B Upflow Downflow Back to Back Configuration Refer to Fig 21 and Table 4 for appearance and dimensio...

Страница 28: ...both furnaces See Fig 25 c Drive 1 factory supplied No 6 X 3 4 in LG screw through each hole and tighten until furnaces are secure and foam strips have sealed gap between furnaces 7 Determine which si...

Страница 29: ...bles per the furnace Installation Start up and Operating Instructions 5 Unistrut or similar material may be used provided that the furnaces do not sag in the middle or bend or twist at the support end...

Страница 30: ...w applications reference the furnaces from the front as you would see them in the upflow application See Fig 29 The LH furnace is the main furnace and the RH furnace is the secondary furnace b In the...

Страница 31: ...20 and 29 Route female four pin connector through previously installed bushings in unused condensate drain holes located on casing in blower compartment area Connect to male four pin connector of RH...

Страница 32: ...ZARD Failure to follow this caution could result in intermitted furnace operation and unit damage Supply air temperature will be uneven left to right when only main system is operating Fig 29 Twinning...

Страница 33: ...as shown in Fig 23 2 Position ALS S so terminals face front of furnace 3 Secure bracket to blower housing using factory supplied No 6 X 3 4 in LG screw b Install auxiliary door switch ILK 1 1 Drill 7...

Страница 34: ...ers connected to the same service panel 115 vac phase leg On single phase residential systems each furnace circuit breaker should be located directly across from each other in service panel or each fu...

Страница 35: ...single stage thermostat 327893 101 Single Stage furnaces with two stage thermostat 327892 101 Two Stage furnaces with single stage or 2 stage thermostat 327891 101 Fig 33 Concentric Vent and Combusti...

Страница 36: ...out main limit or twinning kit auxiliary limit switch in which case both furnaces respond Before performing component test disconnect TKR yellow wire labeled TEST from LH furnace control center TEST...

Страница 37: ...RELAY SPST N O HUM 24VAC HUMIDIFIER CONNECTION 0 5 AMP MAX IDM INDUCED DRAFT MOTOR PSC IDR INDUCED DRAFT MOTOR RELAY SPST N O ILK BLOWER ACCESS PANEL INTERLOCK SWITCH SPST N O J1 BLOWER OFF DELAY JUMP...

Страница 38: ...BOX LED LIGHT EMITTING DIODE FOR STATUS CODES AMBER LGPS LOW GAS PRESSURE SWITCH SPST N O LPS LOW HEAT PRESSURE SWITCH SPST N O LS LIMIT SWITCH AUTO RESET SPST N C OL AUTO RESET INTERNAL MOTOR OVERLOA...

Страница 39: ...ard Energizes accessory cooling relay s to start L H and R H A C for cooling G G Starts both indoor fans on cooling speed With Y Y2 energized Dehum Dehum Reduces airflow in cooling mode from cooling s...

Страница 40: ...on cooling speed With Y Y2 energized Dehum Dehum Reduces airflow in cooling mode from cooling speed to heating speed when Dehum input is removed Do not remove ACRDJ from furnace control boards Dehum...

Отзывы: