
3
INSTALLATION
INSULATION
VAPOR TUBE
LIQUID TUBE
OUTDOOR WALL
INDOOR WALL
LIQUID TUBE
VAPOR TUBE
INSULATION
CAULK
Avoid contact between tubing and structure
NOTE:
THROUGH THE WALL
HANGER STRAP
(AROUND VAPOR
TUBE ONLY)
JOIST
1” MIN.
SUSPENSION
A94026
Fig. 2
---
Connecting Tube Installation
Specifications for this unit in residential new construction market
require the outdoor unit, indoor unit, refrigerant tubing sets,
metering device, and filter drier listed in presale literature. There
can be no deviation. Consult the Application Guideline and
Service Manual – Air Conditioners and Heat Pumps Using Puron
Refrigerant to obtain required unit changes for specific
applications and for R--22 retrofit.
STEP 1
—
Check Equipment and Job Site
UNPACK UNIT
Move to final location. Remove carton taking care not to damage
unit.
INSPECT EQUIPMENT
File claim with shipping company prior to installation if shipment
is damaged or incomplete. Locate unit rating plate on unit corner
panel. It contains information needed to properly install unit.
Check rating plate to be sure unit matches job specifications.
STEP 2
—
Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie
down bolts should be used and fastened through knockouts
provided in unit base pan. Refer to unit mounting pattern in Fig.
3 to determine base pan size and knockout hole location.
For hurricane tie downs, contact distributor for details and PE
Certified (Professional Engineer), if required.
On rooftop applications, mount on level platform or frame. Place
unit above a load--bearing wall and isolate unit and tubing set
Consult local codes governing rooftop applications.
Roof mounted units exposed to winds above 5 mph may require
wind baffles. Consult the Application Guideline and Service
Manual -- Residential Split System Air Conditioners and Heat
Pumps Using Puron Refrigerant for wind baffle construction.
UNIT BASE PAN
DIMENSIONS
TIEDOWN KNOCKOUT LOCATIONS
A
B
C
36--1/2 x 40
11--5/8
6--13/16
28--3/4
29--1/2 X 33
10–1/16
5–5/8
23–3/4
A05177
Fig. 3
---
Clearance Requirements
NOTE
: Unit must be level to within
±
2
_
(
±
3/8 in./ft.) per
compressor manufacturer specifications.
STEP 3
—
Clearance Requirements
When installing, allow sufficient space for airflow clearance,
wiring, refrigerant piping, and service. Allow 30--in. clearance to
service end of unit and 48 in. above unit. For proper airflow, a
6--in. clearance on 1 side of unit and 12 in. on all remaining sides
must be maintained. Maintain a distance of 24 in. between units.
Position so water, snow, or ice from roof or eaves cannot fall
directly on unit.
On rooftop applications, locate unit at least 6 in. above roof
surface.
STEP 4
—
Operating Ambient
The minimum outdoor operating ambient in cooling mode is
55
_
F without low ambient cooling enabled, and the maximum
outdoor operating ambient in cooling mode is 125
_
F. On Infinity
communicating systems only, for both 24ANA1 and 24ANA7
models, low ambient cooling is available to 0
_
F.
STEP 5
—
Install TXV
NOTE
: Applies to non--TXV indoor units only. If installing a
rated and approved indoor coil without a factory installed Puron
TXV, remove and replace the fixed orifice or R--22 TXV
expansion device with a hard shutoff Puron balance port TXV.
The thermostatic expansion valve is specifically designed to
operate with Puron. Do not use an R--22 TXV. An existing R--22
TXV must be replaced with a factory--approved TXV specifically
designed for Puron.
Refer to Product Data Sheet for the
appropriate TXV kit number.
24AN
A