F97CMN and G97CMN: Installation, Start-up, Operating and Service and Maintenance Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
34
When determining appropriate location for termination, consider the
following guidelines:
1. Comply with all clearance requirements stated in
per application.
2. Termination or termination kit should be positioned where vent
vapors will not damage plants/shrubs, air conditioning equipment
or utility meters.
3. Do not locate termination directly into prevailing winds.
Termination should be positioned so that it will not be affected by
sustained prevailing winds over 30 mph, wind eddy, such as inside
building corners, or by recirculation of flue gases, airborne leaves,
or light snow.
4. Termination or termination kit should be positioned where it will
not be damaged by or subjected to foreign objects such as stones,
balls, etc.
5. Termination or termination kit should be positioned where vent
vapors are not objectionable
.
NOTICE
!
RECOMMENDED SUPPORT FOR
VENT TERMINATIONS
It is recommended that sidewall vent terminations in excess of 24
inches (0.6 M) or rooftop terminations in excess of 36 inches (1 M) in
vertical length be supported by
EITHER
the Direct Vent Termination
Kit shown in
or by field-supplied brackets or supports fastened
to the structure.