
28
9. If no voltage is present, remove the second cell. Install cell number one
and measure voltage as described above. If voltage is present, the
second cell, which is now out of the cabinet, is shorted. Refer to Table 1
on page 12.
10. If no voltage is present, remove both cells and measure the power
supply output. While depressing the safety switch, touch the end of the
high voltage probe to either the front or rear contact board assembly
(Figure 10). The meter should read 6.2 kVDC or higher.
11. If no voltage is present, check the power supply. Set the multimeter for
reading AC voltage at 200 volt full scale and attach meter test leads.
12. While depressing the safety lever, touch the two transformer output lead
junctions to the power supply board with the meter leads and read the
meter.
13. If there is no output voltage from 24 volt transformer, replace the 24 volt
transformer and power supply board.
Содержание EACA 0014
Страница 33: ...31 EACA ...