
22
ELECTRICAL INSTALLATION
All wiring must comply with applicable local and national codes.
CAUTION:
Be sure all incoming power is OFF before beginning any procedures.
CAUTION:
The following instructions are for use by qualified personnel only.
The Electronic Air Cleaner (without the AFS installed at the factory) is designed to take advantage of the integrated
accessory control panel available on most furnaces. The 120V Electronic Air Cleaner tap on the furnace will provide
power to the air cleaner only when the circulating air blower is in operation.
Read the instructions in the furnace installation manual carefully before attempting installation or operation. Failure to
follow these instructions may result in improper installation and therefore void warranty.
An optional(on 120v model) electronic air flow sensor kit is available if the air cleaner is not equipped with an AFS. This
air flow sensor will sense the air movement within the duct and turn the Electronic Air Cleaner on and off accordingly.
Figure 8
WARNING:
The following procedures will expose hazardous live parts. Disconnect power between checks and
proceed carefully. Electrical shock can cause injury or death.
WIRING PROCEDURE
FURNACE APPLICATION
This air cleaner is powered by providing power to pigtail
leads at field wiring compartment (see knock-out holes)
located at the rear of the power pack assembly (See Fig.
8).
1. Turn air cleaner OFF using ON/OFF switch located on
front panel.
2. Remove power pack cover plate by removing front
door and two screws holding assembly to the top of
the air cleaner.
3. Make wiring connections inside junction box area
(See Fig. 8). Remove knock-out and use conduit or
other approved methods to supply input power.
Connect ground wire to clip.
4. Replace the power supply cover plate and secure with
screws removed from step 2.
5. Replace the unit door to the front of the air cleaner.
6. Air cleaner will now operate when door is in place,
ON/OFF rocker switch is in the ON position and input
voltage is present in the junction box. The following
should be completed to supply input power to the air
cleaner.
It is recommended to use EAC 1 and EAC 2 terminals
when provided by the furnace circuit board. These
outputs will provide 120 vac whenever the blower motor
is energized.
Furnace circuit boards without EAC 1 and EAC 2
terminals MUST use alternate methods to supply to
supply power to the air cleaner. Options include Sail
Switch , Isolation relay or Optional AFS (Air Flow Sensor).
Air cleaner should only operate when blower motor is
running.
CAUTION
CAUTION
This unit cannot be powered directly from blower motor
leads. Voltages can exceed 190vac for 120-v. motors or
possibly double with 240-v. fan coil motors.
If EAC 1 and EAC 2 terminals are provided by fan coil
circuit
FAN COIL APPLICATION of 0014 or 0020 Models (120-v.)
board, refer to fan coil data to determine voltage
output. Most fan coils do not provide 120-v. at these
terminals. Alternate methods may be needed to convert
fan coil supply voltage to 120-v. for the cleaner. A 240-v. to
120-v step down transformer (60 v.) will be needed in most
applications. Sail Switch, Isolation relay or Optional AFS
(Air Flow Sensor) may also be needed.
The Model 2020 is a 240-v. power supply model designed
to match you fan coil. To install this model with a 240-v. fan
coil:
This unit cannot be powered directly from blower motor
leads. Back EMF (electro magnetic field) voltages can
reach 400 vac for 240-v. fan coil motors.
1. Turn air cleaner OFF using ON/OFF rocker switch
located on front panel.
2. Remove power pack cover plate by removing front
door and two screws holding assembly to the top of the
air cleaner.
3. Make wiring connections inside junction box area (See
Fig. 8). Remove knock-out and use conduit or other
approved methods to supply input power. Connect
ground wire to clip.
4. Replace the power supply cover plate and secure with
screws removed from step 2.
5. Replace the unit door to the front of the air cleaner.
6. Air cleaner will now operate when door in place,
ON/OFF rocker switch is in the ON position and input
voltage is present in the junction box.
FAN COIL APPLICATION of 2020 Model (240-v.)
Содержание EACA 0014
Страница 33: ...31 EACA ...