
START-UP CHECKLIST
(Remove and Store in Job File)
I. PRELIMINARY INFORMATION
MODEL NO.:
DATE:
SERIAL NO.:
TECHNICIAN:
II. PRE-START-UP (insert checkmark in box as each item is completed)
M
VERIFY THAT CONDENSATE CONNE CTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
M
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
M
CHECK THAT RETURN (INDOOR) AIR FILTERS ARE CLEAN AND IN PLACE
M
VERIFY THAT UNIT INSTALLATION IS LEVEL
M
CHECK FAN WHEEL AND PROPELLER(S) FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW
TIGHTNESS
M
CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE
L1-L2
L2-L3
L3-L1
CIRCUIT 1 COMPRESSOR AMPS
L1
L2
L3
CIRCUIT 2 COMPRESSOR AMPS
L1
L2
L3
INDOOR (EVAPORATOR) FAN AMPS
L1
L2
L3
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
DB
RETURN-AIR TEMPERATURE
DB
WB
COOLING SUPPLY AIR
PRESSURES
REFRIGERANT SUCTION, CIRCUIT 1
PSIG
REFRIGERANT SUCTION, CIRCUIT 2
PSIG
REFRIGERANT DISCHARGE, CIRCUIT 1
PSIG
REFRIGERANT DISCHARGE, CIRCUIT 2
PSIG
M
VERIFY THAT 3-PHASE SCROLL COMPRESSOR IS ROTATING IN CORRECT DIRECTION
M
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGES 30 AND 31.
----------------------------------------------------------------------------------------
CUT
ALONG
DOTTED
LINE
Copyright 1995 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1
4
Tab
1b 6b
PC 111
Catalog No. 535-042
Printed in U.S.A.
Form 50GJ-1SI
Pg CL-1
4-95
Replaces: New
Содержание 50GJ006
Страница 30: ...Fig 37 Cooling Charging Chart 50GJ006 Fig 38 Cooling Charging Charts 50GJ008 30...
Страница 31: ...Fig 39 Cooling Charging Charts 50GJ012 31...
Страница 35: ......