START-UP CHECKLIST FOR 42TW SERIES FAN COIL UNIT
I. Project Information
Job Name
_______________________________________________________________________
Address ________________________________________________________________________
City ______________________________________________State __________ Zip __________
Installing Contractor
_______________________________________________________________
Sales Office _____________________________________________________________________
Start-up Performed By
_____________________________________________________________
INSPECTION, INSTALLATION, & START-UP CHECKLIST
ITEM COMPLETE
ITEM COMPLETE
Receiving & Inspection
1. Unit received undamaged
2. Unit received complete as ordered
3. Unit arrangement/hand correct
4. Unit structural support complete &
correct
Handling & Installation
5. Mounting grommets / isolators
used
6. Proper access provided for unit &
accessories
9. Proper electrical service provided
7. Proper overcurrent protection
provided
8. Proper service switch / disconnect
provided
9. Proper refrigerant line sizes to unit
10. All service to unit in code
compliance
11. All shipping screws & braces
removed
12. Unit protected from direct &
foreign matter
Cooling / Heating Connections
13. Connect field piping to unit
14. Pressure test all piping for leaks
15. Install drain line & traps as
required
16. Insulate all piping as required
Ductwork Connections
17. Install ductwork, Fittings, &
Grilles as required
18. Flexible duct connections at unit
19. Proper supply & return grille type
& size used
20. Insulate all ductwork as required
Electrical Connections
21. Refer to unit wiring diagram
22. Connection incoming power
service(s)
23
,QVWDOO FRQQHFWLRQ³IXUQLVKRQO\´
parts
24. All field wiring in code compliance
Unit Startup
25. General visual unit & system
inspection
26. Check for proper fan belt tension
27. Check for proper fan rotation
28. Record electrical supply voltage
29. Record ambient temperatures
30. Check all wiring for secure
connections
31. Close all unit isolation valves
32. Flush water systems
33. Fill systems with water /
refrigerant
34. Vent water systems as required
35. All ductwork & grilles in place
36. All unit panels & filters in place
37. Start fans, pumps, chillers, etc.
38. Check for overload condition of all
units
39. Check all ductwork & units for air
leaks
40. Balance air systems as required
41. Record all final settings for future
use
42. Check piping & ductwork for
vibration
43. Verify proper cooling operation
44. Verify proper heating operation
45. Reinstall all covers & access
panels