Model 6105 Operations ManualH
Rev M 07-16-182/14/2021
Page 12 of 34
OPERATION
Start Up
Be sure the water connections are properly made and the exhaust vent properly
closed (see installation section). Turn on unit by pressing the power switch. The
‘power on’ indicator light, temperature and timer displays will illuminate. Air should
be gently circulating internally.
Control panel layout
Temperature
controller
Humidity
control
enable
Countdown
timer
Light
switch
Humidity
controller
Power switch
‘Power On’
indicator light
Temperature
and timer
displays
Содержание 6105
Страница 1: ......
Страница 13: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 13 of 34 ...
Страница 15: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 15 of 34 ...
Страница 18: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 18 of 34 ...
Страница 21: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 21 of 34 ...
Страница 24: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 24 of 34 ...
Страница 25: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 25 of 34 5 ...
Страница 27: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 27 of 34 ...
Страница 31: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 31 of 34 Electrical Schematic ...
Страница 32: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 32 of 34 ...