
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
22
SPEEDCHECK-15/18 USER MANUAL
4.0 INSTALLATION
4.6 Cabinet Installation
Before mounting the cabinet to the pole, all wiring internal to the pole (power, LED, optional
StreetHub™serial and ground cables) should be fished.
1. Loosen four nuts on back of cabinet and spread brackets outward. Tighten nuts to 20 ft-lb.
On the back of the cabinet, there are 2 drill points that may be used for routing of liquid-tight
conduit external to the mounting pole. Prior to drilling the cabinet, ensure there are no
components which may be damaged on the inside of the cabinet
.
2. Drill a 1-
3/4” diameter hole in pole for cabinet pipe nipple at desired position.
3. Route cables from pole into cabinet and temporarily affix cabinet against the pole. For U-bolt mounting,
install U-bolts, washers and nuts then torque to 30 ft-lb. For banding, install banding through openings in
brackets.
4. If desired, before tightening banding, brackets and banding can be adjusted inboard again. Tighten
banding (up to ¾” wide) as per banding manufacturer’s instructions.