CARLO GAVAZZI RSBS Series Скачать руководство пользователя страница 15

15

Carlo Gavazzi Ltd.

RSBS

RSBS DS ENG

 27/05/20

Number of flashes

7

Alarm

Compressor running in reverse

Alarm description

The RSBS shall detect that the compressor is rotating in the reverse direction within 2 

seconds. The alarm is active in bypass state only.

Alarm recovery period

5 minutes

Consecutive alarms for 

hard reset 

4

Action to recover alarm

The alarm will self-recover after the recovery period.

Troubleshooting

• Check for unstable or low supply voltage level.

Number of flashes

8

Alarm

Load loss

Alarm description

This alarm will be triggered when the load current is ≤ 2 AAC for ≥ 1 mains cycle. The alarm 

will be active during ramp-up and bypass mode.

Ramp-up: As soon as the ON signal is turned ON, the RSBS will start the ramp-up func-

tion. If the measured current is ≤ 2 AAC then the RSBS will not attempt a start 

and will raise the load loss alarm.

Bypass: If during bypass the measured current is ≤ 2 AAC for ≥ 1 mains cycle, the RSBS 

will trigger the load loss alarm.

Alarm recovery period

5 minutes

Consecutive alarms for 

hard reset 

N/A

Action to recover alarm

The alarm will self-recover after the recovery period. Load current will not be monitored 

during recovery from alarm. If, during transition from alarm recovery to start of ramp-up, 

the measured current is ≤ 2 AAC ≥ 1 mains cycle the RSBS will re-trigger the alarm.

The alarm will self-recover after 5 minutes.

Troubleshooting

• Check that the compressor (or a load > 2 Arms) is connected to the RSBS.

• Check quality of supply. This alarm may also be triggered when there is complete supply 

voltage interruption.

Number of flashes

10

Alarm

Welded main relay, Shorted SCR, Welded bypass relay

Alarm description

This alarm will be triggered when :-

1. The RSBS detects a current on the “L” connection when it is in IDLE state. (Fault: 

Welded main relay). In this case the RSBS will trigger the alarm after 100 ms.

2. The RSBS detects a current > Imax HP during ramp-up state (Fault: SCR short or 

bypass relay welded). The RSBS will trigger the alarm after ≈ 100 ms.

Alarm recovery period

Non-recoverable alarm

Consecutive alarms for 

hard reset 

1

Action to recover alarm

The alarm will not self-recover. In case of a main relay weld condition the user needs to 

provide an external means to disengage the compressor from the mains. (Since the aux-

iliary winding will remain connected to L and N through the main relay and run capacitor).

Troubleshooting

• Replace RSBS and contact your local Carlo Gavazzi representative.

• Check compressor winding resistance and verify that this is within manufacturer speci

-

fications.

Содержание RSBS Series

Страница 1: ...ht flicker RSBS reduces the compressor start current by 50 to reduce light flickering Description The RSBS V23C is a single phase soft starter for 1 phase compressors up to 32 Arms The RSBS can limit...

Страница 2: ...3C10HP 145 175 F RSBS2332A2V23C17HP External RSBS2332A2V23C00HP For proper model selection refer to our online soft starter selector tool http www gavazziautomation com nsc HQ EN soft_starters The int...

Страница 3: ...ose Component name code Notes External start capacitor kit STARTCAP 200UF SMA For RSBS2332A2V23C00HP models Selection guide Category Compressor maximum operating current IMAX Model selection Compresso...

Страница 4: ...ery between starts the RSBS will not respond to control voltage C Outputs R Connection to compressor main winding R Rc Connection to run capacitor L L1 Mains supply connection N L2 Supply neutral conn...

Страница 5: ...orithm During the ramp up sequence the RSBS will check if the motor is rotating If the RSBS finds that the motor is in locked rotor condition it will trigger the HP function after 250 ms See Fig 2 Dur...

Страница 6: ...avazzi Ltd RSBS RSBS DS ENG 27 05 20 Features Material PA66 Assembly DIN or panel Touch protection IP20 Weight Approx 450 g Overvoltage category II General data Fig 4 RSBS2332A2V23C HP Fig 3 RSBS2332A...

Страница 7: ...ickup voltage 90 VAC Drop out voltage 25 VAC Power supply Environmental Operating temperature RSBS2332A2V23C00HP 20 C to 65 C 4 F to 149 F RSBS2332A2V23C HP 20 C to 55 C 4 F to 131 F Storage temperatu...

Страница 8: ...gnetic compatibility EMC emissions Radio interference field emissions conducted CISPR 11 EN IEC 55011 Class B1 Harmonics IEC EN 61000 3 21 IEC EN 61000 3 121 Disturbance power CISPR 14 IEC EN 55014 11...

Страница 9: ...of output relay 1 Function of relay Alarm Rated operational voltage 250 VAC 30 VDC Rated insulation voltage 250 VAC Dielectric withstand voltage 2 5 kV Overvoltage category II Type of control circuit...

Страница 10: ...o IEC EN 60947 4 2 Terminal markings Marking R Connection to compressor main winding R Rc Connection to run capacitor L L1 Mains supply connection N L2 Supply neutral connection L2 connection for U S...

Страница 11: ...ing length 8 0 mm Auxiliary conductors 11 12 14 Flexible solid or stranded 0 2 1 5 mm2 AWG 30 12 Terminal screws M3 Maximum tightening torque 0 5 Nm 4 5 lb in Stripping length 7 0 mm 8 0 mm Wiring dia...

Страница 12: ...rm recovery ON OFF Flashing 11 14 Recovery time2 between starts ON ON OFF 11 12 Internal power supply fault Flashing OFF OFF 11 12 LED and Relay status indications 2 If supply on RSBS is removed befor...

Страница 13: ...after the recovery period Voltage dips interruptions during re covery between starts and or alarm recovery shall be ignored Troubleshooting Check for any loose connections on L L1 and N L2 terminals C...

Страница 14: ...paci tor This results in less starting torque and therefore the compressor might not start Alarm recovery period 5 minutes Consecutive alarms for hard reset 4 Action to recover alarm The alarm will se...

Страница 15: ...ery from alarm If during transition from alarm recovery to start of ramp up the measured current is 2 AAC 1 mains cycle the RSBS will re trigger the alarm The alarm will self recover after 5 minutes T...

Страница 16: ...temperature alarm Alarm description The RSBS will trigger this alarm if it measures an internal temperature 130 C for 100 ms Alarm recovery period Alarm does not self recover Consecutive alarms for h...

Страница 17: ...e than 5 000 symmetrical Amperes 240 Volts maximum when protected by fuses Tests at 5 000 A were performed with Class RK5 fuses please refer to the table below for maximum allowed Ampere rating of the...

Отзывы: