KOHJ-H-01-EN1-1.7-15112021
21
4.3 Commissioning the controller
1. Suspend the controller at the end of the
bed in as central position as possible.
3. Close the zipper of the tube sleeve and make sure that the tube sleeve is as secure as possible
in relation to the bed structure.
4. Connect the power cable to the mains con-
nector of the controller.
2. To connect the three colour-coded tubes of
the air tube system to their counterpieces,
push and turn them clockwise.
5. Connect the Sixtube connector to the con-
troller with the blue release button fac-
ing up and make sure the connector snaps
when locking into place.