18/33
2).
After removing the inner air-duct board, we can see suction pipe and capillary pipe joint
(Fig.7)
A: Capillary solder joint.
B: Suction pipe solder joint
C: Upper compartment fan connector
D: Upper compartment sensor connector
E: Heater fan connector
F: Heater connector
G: Defrost sensor connector
H: Air cycling fan connector
I
: Lower compartment sensor
J: evaporator
Screws
Inner
air-duct
board
Fig.6
Содержание WC6216
Страница 1: ...WC6216 Caple 60cm in column wine cabinet Technical information ...
Страница 2: ......
Страница 5: ......
Страница 12: ...7 33 3 Cooling system diagram ...
Страница 30: ...25 33 Diagram of main PCB connection Fig 16 Fig 15 Main PCB Four barbs fixing PCB ...