15
Step 9
:
Align the bottom cable (71)
underneath
the 4” pulley (70) and insert
both through the hole in the leg extension
(8) and secure, as shown.
Pull the bottom cable (71) through the base
frame (7) and align it
underneath
the 4”
pulley (70) and secure it as shown.
(
BOTTOM CABLE
has a ball on one end
and a ring on the other end)
Please
reference additional instructions on
page 16
Step 10
:
Continue to pull the bottom cable
(71) up through the hole in the base frame
(7). Then fit the cable
above
the 4” pulley
(70) and attach it to the partially assembled
pulley bracket A (26), as shown.
Align the same cable
underneath
another
4” pulley (70) and attach it to the teeth
extending upwards from the base frame (7),
as shown.
Step 11
:
Align the same cable
above
another 4” pulley (70) and attach it to the
partially assembled pulley bracket B (27)
and secure as shown.
Step 12
:
Using the remainder of the bottom
cable (71) attach the carabiners (76) to the
chain. Finally attach the second carabiner
(76) the hook on the base frame (7), as
shown.