23
Structure of High Pressure Switch
Contact Point
Pressure Detected
Connected to the electrical wire
DANGER
Do not change the high-pressure switch locally or
change the high pressure cut-out set value locally. If
changed, it will cause serious injury or death due to
explosion. Do not attempt to turn service valve rod
beyond its stop.
12. TRANSPORTATION AND
HANDLING
When hanging the unit, ensure a balance of the unit,
check safety and lift it up smoothly
Do not remove any packing materials.
Hang the unit under packing condition with two ropes.
For safety reasons ensure that the outdoor unit is
lifted smoothly and does not lean
Gross
Weight (kg)
Model
8
-14 kW
90
0.7 -1.0 m
> 60º
13. BEFORE OPERATION
CAUTION
Supply electrical power to the system for approximately
12 hours before start-up or a long shutdown. Do not
start the system immediately after power supply,
it may cause a compressor failure because the
compressor is not heated well.
When the system is started after a shutdown longer
that approximately 3 months, it is recommended to
check the system by your service contractor.
Turn OFF the main switch when the system is to be
stopped for a long period of time: If the main switch