6
6
6-3
6-3
Installation > Checking Before Installation > Checking the Power Supply
Installation > Checking Before Installation > Checking the Power Supply
Checking Before Installation
The installation site must satisfy the conditions given below.
Therefore, it is recommended that the installation site be looked over before delivering the finisher to the customer.
Checking the Power Supply
The finisher must be connectable to the outlet that can supply the rated v10/-15% at the specified ampere or higher.
120V 15A or more
230V 10A or more
Содержание Staple Finisher-D1
Страница 4: ...0 0 0 4 0 4 ...
Страница 9: ...Safety Precautions Notes Before it Works Servicing ...
Страница 11: ...1 1 Product Outline Product Outline Features Specifications Names of Parts Optional Construction ...
Страница 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Страница 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Страница 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...