6
6
6-10
6-10
Installation > Unpacking and Checking the Contents > Unpacking Procedure
Installation > Unpacking and Checking the Contents > Unpacking Procedure
1) Open the container box, and then take out the accessory box and
cushioning materials.
F-6-12
F-6-12
2) While holding the top of the finisher, raise one side of the finisher
to remove the cushioning material.
Be sure to pull the plastic bag toward the other cushioning material
completely.
F-6-13
F-6-13
3) While holding the top of the finisher, raise the other side to remove the
cushioning material and plastic bag.
F-6-14
F-6-14
4) Remove two slope boards and two fixing pins.
MEMO:
The fixing pins are attached to the slope board with the adhesive tape.
F-6-15
F-6-15
5) Using two fixing pins, secure the slope boards to the pallet.
F-6-16
F-6-16
Содержание Staple Finisher-D1
Страница 4: ...0 0 0 4 0 4 ...
Страница 9: ...Safety Precautions Notes Before it Works Servicing ...
Страница 11: ...1 1 Product Outline Product Outline Features Specifications Names of Parts Optional Construction ...
Страница 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Страница 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Страница 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...