Operation Checks
■ For imagePRESS C10000VP/
C8000VP Series/imagePRESS C850/
C750/C650/C65 Series
1. When all the installations have completed, check
that the Leakage Breaker is turned ON.
O
N
O
FF
Leakage Breaker
2. Turn ON the main power of the host machine.
3. Confirm that the combination of the firmware
version for the Host Machine and this equipment is
appropriate.
4. Check for Z-fold, C-fold, outer threefold, four-fold,
and two-fold operations.
■ For imageRUNNER ADVANCE 8500
Series/imageRUNNER ADVANCE
C7500 Series
1. When all the installations have completed, check
that the Leakage Breaker is turned ON.
O
N
O
F
F
Leakage Breaker
2. Turn ON the main power of the host machine.
3. If a message prompting the user to update the
version appears, press [Update] to automatically
update the version of this equipment.
NOTE:
If [Skip] is selected, a message prompting the user to
update the version will appear every time the host machine
is started. In the service mode (Level 2) shown below, it is
possible to set not to display the message.
• (Lv.2) COPIER > OPTION > FNC-SW > VER-CHNG
4. Check for Z-fold, C-fold, outer threefold, four-fold,
and two-fold operations.
6. Installation
151
Содержание Paper Folding Unit-J1
Страница 1: ...Revision 3 0 Paper Folding Unit J1 Service Manual ...
Страница 9: ...Product Overview 1 Outline 4 Specifications 5 Names of Parts 9 ...
Страница 18: ...Technical Explanation 2 Basic Configuration 13 Controls 25 Upgrading 55 ...
Страница 30: ...4 Delivery operation Feeds the paper to the finisher through the delivery path 2 Technical Explanation 24 ...
Страница 62: ...Periodical Service 3 List of Work for Scheduled Servicing 57 ...
Страница 73: ... Procedure 1 Remove the screws 2 Screws 2x 4 Disassembly Assembly 67 ...
Страница 95: ...Adjustment 5 Overview 90 Major Adjustment 93 Action on parts replacement 105 ...
Страница 155: ...13 Return the jam recovery map and close the front upper cover 6 Installation 149 ...
Страница 158: ...APPENDICES Service Tools 153 General Circuit Diagram 154 ...