● For imageRUNNER ADVANCE C7500
Series
1. Remove the 2 face covers.
NOTE:
The Buffer Pass Unit must be installed before installing
this Equipment.
• 2 Claws
2. Fix the 2 Clamp Plates and the Positioning Pin to the
host machine. At this time, fix the supplied Ground
Plate along with the rear Clamp Plate in the rear side.
• 6 Screws (RS Tightening ; M4x8)
RS Tightening ; M4x8
6x
● For imageRUNNER ADVANCE 8500
series
1. Remove the 3 face covers.
• 3 Claws
2. Fix the 2 Latch Catches and the Positioning Pin to
the host machine. At this time, fix the supplied
Ground Plate along with the rear Latch Catch in the
rear side.
• 6 Screws (RS Tightening ; M4x8)
6x
RS Tightening ; M4x8
6. Installation
125
Содержание Paper Folding Unit-J1
Страница 1: ...Revision 3 0 Paper Folding Unit J1 Service Manual ...
Страница 9: ...Product Overview 1 Outline 4 Specifications 5 Names of Parts 9 ...
Страница 18: ...Technical Explanation 2 Basic Configuration 13 Controls 25 Upgrading 55 ...
Страница 30: ...4 Delivery operation Feeds the paper to the finisher through the delivery path 2 Technical Explanation 24 ...
Страница 62: ...Periodical Service 3 List of Work for Scheduled Servicing 57 ...
Страница 73: ... Procedure 1 Remove the screws 2 Screws 2x 4 Disassembly Assembly 67 ...
Страница 95: ...Adjustment 5 Overview 90 Major Adjustment 93 Action on parts replacement 105 ...
Страница 155: ...13 Return the jam recovery map and close the front upper cover 6 Installation 149 ...
Страница 158: ...APPENDICES Service Tools 153 General Circuit Diagram 154 ...