Making Checks after
Completion of Installation
Disposal Parts
■ For imagePRESS C10000VP/
C8000VP Series
1. Following disposal parts are remained after
completion of the installation work.
• When connected to Host Machine (upstream
equipment)
[1] Screw (Binding; M4x10) 1pc.
[2] Stopper (front) 1pc.
[3] Stopper (rear) 1pc.
[4] Screw (Flat Head Screw; M3x5) 2pcs.
[5] Interface Cable 1pc.
[6] Screw (RS Tightening; M4x8) 2pcs.
[7] Screw (W Sems; M4x12) 1pc.
[8] Remaining Language Jam label 1pc.
• When connected to the Document Insertion Unit/
Multi Function Professional Puncher/ Perfect
Binder/ High Capacity Stacker. (upstream
equipment)
[1] Stopper (front) 1pc.
[2] Stopper (rear) 1pc.
[3] Screw (Flat Head Screw; M3x5) 2pcs.
[4] Interface Cable 1pc.
[5] Screw (RS Tightening; M4x8) 2pcs.
[6] Screw (W Sems; M4x12) 1pc.
[7] Remaining Language Jam label 1pc.
■ For imagePRESS C850/C750/
C650/C65 Series
1. Following disposal parts are remained after
completion of the installation work.
[1] Stopper (front) 1pc.
[2] Stopper (rear) 1pc.
[3] Screw (Flat Head Screw; M3x5) 2pcs.
[4] Interface Cable 1pc.
[5] Screw (RS Tightening; M4x8) 2pcs.
[6] Screw (W Sems; M4x12) 1pc.
[7] Remaining Language Jam label 1pc.
■ For imageRUNNER ADVANCE
C7500 Series
1. Following disposal parts are remained after
completion of the installation work.
• When connected to the host machine (upstream
equipment)
[1] Face cover of the host machine 2pcs.
[2] Screw (Binding; M4x10) 1pc.
[3] Stopper (front) 1pc.
[4] Stopper (rear) 1pc.
[5] Screw (Flat Head Screw; M3x5) 2pcs.
[6] Removed Interface Cable 1pc.
[7] Removed face cover 1pc.
[8] Remaining Language Jam label 1pc.
• When connected to the Document Insertion Unit
(upstream equipment)
[1] Stopper (front) 1pc.
[2] Stopper (rear) 1pc.
[3] Screw (Flat Head Screw; M3x5) 2pcs.
[4] Removed Interface Cable 1pc.
[5] Removed face cover 1pc.
[6] Remaining Language Jam label 1pc.
■ For imageRUNNER ADVANCE 8500
Series
1. Following disposal parts are remained after
completion of the installation work.
• When connected to Host Machine (upstream
equipment)
[1] Face cover of the host machine 3pcs.
[2] Screw (Binding; M4x10) 1pc.
[3] Remaining Language Jam label 1pc.
• When connected to Insertion Unit (upstream
equipment)
[1] Stopper (front) 1pc.
[2] Stopper (rear) 1pc.
[3] Screw (Flat Head Screw; M3x5) 2pcs.
[4] Remaining Language Jam label 1pc.
• When connected to the Staple Finisher-X1/ Booklet
Finisher-X1 (downstream equipment)
[1] Removed Interface Cable 1pc.
[2] Removed face cover 1pc.
• When connected to the Staple Finisher-W1/
Booklet Finisher-W1 (downstream equipment)
[1] Interface Cable 1pc.
[2] Screw (RS Tightening; M4x8) 2pcs.
[3] Screw (W Sems; M4x12) 1pc
6. Installation
150
Содержание Paper Folding Unit-J1
Страница 1: ...Revision 3 0 Paper Folding Unit J1 Service Manual ...
Страница 9: ...Product Overview 1 Outline 4 Specifications 5 Names of Parts 9 ...
Страница 18: ...Technical Explanation 2 Basic Configuration 13 Controls 25 Upgrading 55 ...
Страница 30: ...4 Delivery operation Feeds the paper to the finisher through the delivery path 2 Technical Explanation 24 ...
Страница 62: ...Periodical Service 3 List of Work for Scheduled Servicing 57 ...
Страница 73: ... Procedure 1 Remove the screws 2 Screws 2x 4 Disassembly Assembly 67 ...
Страница 95: ...Adjustment 5 Overview 90 Major Adjustment 93 Action on parts replacement 105 ...
Страница 155: ...13 Return the jam recovery map and close the front upper cover 6 Installation 149 ...
Страница 158: ...APPENDICES Service Tools 153 General Circuit Diagram 154 ...