Unpacking
Unpacking Procedure
NOTE:
The equipment is secured by tapes, cushioning and other
materials to protect it from vibration and impact during
transit. Remove all such tapes and cushioning materials
as instructed below before installing this equipment.
Keep all fixings in a safe place for later reuse in reshipping
the equipment, as for relocation and repairs.
1. Remove the cushioning materials from top of the
equipment.
2. Open the plastic packing bag. Remove the Paper
Deck from the palette with holding the parts as
shown in the figure.
3. Remove the all packaging tapes and cushioning
materials other than the fixing plate on the fixing
plate.
6. Installation
75
Содержание Paper Deck Unit-F1
Страница 13: ... Rear 1 2 No Name 1 Rear Cover 2 Right Cover 1 Product Overview 7 ...
Страница 14: ... Internal 1 2 3 No Name 1 Rear Edge Guide Plate 2 Lifter 3 Left right Edge Guide Plates 1 Product Overview 8 ...
Страница 17: ...Technology 2 Basic Configuration 12 Controls 16 ...
Страница 25: ...Few PS6 PS11 PS5 OFF ON ON Lifter Full PS6 PS11 PS5 ON ON ON Lifter 2 Technology 19 ...
Страница 29: ...Periodical Service 3 List of Work for Scheduled Servicing 24 ...
Страница 33: ...Parts List External Covers 1 2 3 4 5 4 Disassembly Assembly 27 ...
Страница 53: ...2 Remove the Deck Pickup Release Solenoid 1 2 Screws 2 2x 1 2 4 Disassembly Assembly 47 ...
Страница 67: ...Adjustment 5 Adjustment 62 Actions when Replacing the Parts 63 Other Adjustment 72 ...
Страница 73: ...8 Fasten the 2 screws 1 on the left loosened at procedure 2x 1 5 Adjustment 67 ...
Страница 75: ...10 Fasten the 2 screws on the right loosened at procedure 2x 1 5 Adjustment 69 ...
Страница 110: ...APPENDICES Service Tools 105 General Circuit Diagram 106 ...