![Canon imagePRESS C7011VPS series Скачать руководство пользователя страница 44](http://html2.mh-extra.com/html/canon/imagepress-c7011vps-series/imagepress-c7011vps-series_service-manual_3056446044.webp)
Canon
imagePRESS C7011VPS/C6011VPS/C6011S Service Guide
D.
Estimated Installation Times
The table below indicates the estimated length of time needed to unpack and
install the main unit and optional accessories, calculated from the average
amount of labor hours. The estimated unpack and installation times are based
on up to two (2) experienced technicians unless otherwise specified.
The Installation times below are the estimated times required for installation
starting from an unpacked condition. The Installation times are calculated
based on man-hours and are for reference purposes only.
Table 27 – Estimated Installation Times
Description
Estimated Time
imagePRESS C7011VPS Series
140 Minutes
PRISMAsync Controller
15 Minutes
Operator Panel
15 Minutes
Operator Attention Light
5 Minutes
Setup times vary due to many factors, most of which the installation technician has
little control over. Some obstacles may include:
•
Forklift availability and its operator
•
Narrow hallways or a need to remove doors to enter rooms
•
Uneven or damaged floors making leveling equipment difficult and time consuming
With the above-mentioned obstacles considered, an installation of just the Main Station,
Sub Station, Power Unit Supply and PRISMAsync controller of the imagePRESS
C7011VPS Series can take longer than the 175 minutes shown (imagePRESS C7011VPS
the PRISMAsync Controller + Operator Panel + Operator Attention Light) above
and can take between four (4) to six (6) hours depending on conditions at the installation
site.
If accessories are included in the installation, the following estimated times must be added.
Stack Bypass-A1
15 Minutes
POD Deck-A1
35 Minutes
Secondary POD Deck-A1
50 Minutes
Paper Deck-AC1
15 Minutes
High Capacity Stacker-C1 / Secondary High Capacity Stacker-C1
30 Minutes
High Capacity Stacker-G1
60 Minutes
Finisher-AJ1/Saddle Finisher-AJ2
15 Minutes
Booklet Trimmer-D1
30 Minutes
Two-Knife Booklet Trimmer-A1
10 Minutes
Professional Puncher-B1 including Integration Unit-A1
20 Minutes
Color Image Reader-H1
50 Minutes
DADF-R1
20 Minutes
Document Insertion Unit-C1
20 Minutes
Puncher Unit-BB1
25 Minutes
Perfect Binder-B1
60 Minutes
imagePRESS C7011VPS/C6011VPS/C6011S Service Guide
January 2015
Revision 3
Page 38
Содержание imagePRESS C7011VPS series
Страница 1: ...Canon Service Guide...