4
4
4-6
4-6
Parts Replacement and Cleaning Procedure > Main Units (DADF) > Removing the Feed Unit
Parts Replacement and Cleaning Procedure > Main Units (DADF) > Removing the Feed Unit
Main Units (DADF)
Removing the Feed Unit
1) Remove the DADF from the host machine.
2) Open the feeder cover.
3) Remove the front cover.
"Removing the Front Cover"(page 4-4).
4) Remove the feeder cover.
"Removing the Feeder Cover"(page 4-5).)
5) Remove the tray holder.
6) Remove the rear cover.
"Removing the Rear Cover"(page 4-4).
7) Disconnect the nine connectors from the ADF driver PCB.
8) Remove the document tray.
9) Remove the ADF motor.
"Removing the ADF Motor(M1)"(page 4-10).
10) Remove the left hinge.
- Screw 5 pcs.
x5
F-4-10
• 11) Remove the harness guide.
- Connector 5 pcs.
- Screw 1 pcs.
x1
x5
12) Remove the pickup clutch/registration clutch.
"Pickup Clutch/Registration Clutch(CL1/
13) Remove the feed unit.
- Screw 8 pcs.
x8
F-4-11
F-4-12
Содержание DADF-AG1
Страница 4: ...Blank Page ...
Страница 7: ...Safety Precautions Notes Before it Works Serving Points to Note at Cleaning ...
Страница 9: ...1 1 Product Outline Product Outline Features DADF Specifications DADF Names of Parts DADF ...
Страница 11: ...2 2 Technology Technology Basic Configuration DADF Controls DADF Work of service DADF ...
Страница 25: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Страница 47: ...5 5 Adjustment Adjustment Overview DADF Adjustment Method DADF ...
Страница 65: ...Appendix Service Tools DADF Signal Name List DADF General Circuit Diagram DADF ...