i
Preface
i
12
Other Caution before Starting up
!
Warning
The starting up of this system should only be performed in presence of
CANON service personnel. Ignoring this warning may lead to serious
injuries and discontinuance of all warranty services.
W A R N IN G
!
Warning
We recommend to reinspect the utilities provided by the customer
together with an CANON service personnel for verifying a proper
installation. In addition, all supporting system connections must be
rechecked before turning power on.
W A R N IN G
!
Caution
The primary power voltage should be rechecked prior to turning on the
system.
Deviations in the system line power can cause lethal failures during full
process operation.
C A U T IO N
!
Caution
Check if the system power is within Specification voltage
±
10%.
First verify that the power breaker of the plant (main electricity leakage
breaker) and internal system power breaker (located on the system lower
left side) are all in the off position.
Next, open the cover of the system main power breaker assembly.
Turn on the power of the plant and measure the phase to phase and phase
to ground voltage at the primary side of the system breaker.
C A U T IO N
!
Warning
If the line voltage is not within the specification listed in this manual or
Specifications, do not continue with this procedure.
The customer must supply proper line voltage before the system can be
powered up.
W A R N IN G
Virus Check for Machine Control PC
!
Caution
Virus check is done at the time of ex-factory from CANON Machinery
Corporation, it does not mean to guarantee for the use environment at the
customers' factory. Please perform a virus check at the customer side
using the latest pattern file or serch engine. It is effective to protect the
machine from a virus goes up.
! Please do not station virus measure software permanently to a memory.
Operation of a personal computer may become unstable.
C A U T IO N