12 | Cannon Fitzroy Inbuilt Power Flue
Bend gas pipe and electrical entry tags inwards to allow
cable and gas pipe to enter easily.
Fully extend the flexible flue and air intake and position
these pipes through the hole drilled through the wall.
route condensate tube through smaller hole in wall.
align the gas supply pipe with it’s entry point and the flue
with the cutout in the rear wall.
Slowly slide the heater into position until the mounting
face comes into contact with the vertical wall.
note: as heater is slid into position, ensure that
condensate and flexible flue pipes are fed through their
respective holes. It may be advisable when the heater
is positioned halfway into cavity to check hoses from
outside to ensure that they are not kinked.
refer
FIG 15 & FIG 16.
The flue terminal conical rain hat section may be removed
for horizontal installations. refer
FIG 17 & FIG 18
.
Fitment Of Flexible Pipes To Flue Terminal.
The flexible tubing is now fully extended out of the hole in
the wall.
1. Cut the tubing so that 20mm is extending past the
wall opening.
2. Fit the stainless steel tubing to the flexible pipe from
the flue outlet, using silicon sealant to seal the join and
a hose clamp.
3. Fit the pvc tubing and the air inlet to the other flexible
tube, using a hose clamp.
4. Place terminal cover plate over both air intake and
exhaust air pipes.
5. Fit the stainless tube into the centre pipe of the
flue terminal.
6. using the included cable tie fix the air inlet hose to the
flue pipe.
7. Fix terminal cover to outside wall using suitable
fixtures which are able to be easily removed must be
used.Make sure the terminal cover is affixed correctly
with the cover tapering in a downward direction.
This will ensure when the flue terminal is engaged to
the terminal cover it will be slightly angled to allow for
condensation to escape.
8. Bend tabs on terminal cover and secure
terminal to cover using screws provided.
refer to australian Standard gas Installations aS 5601:
for ‘location of powerflue terminal’.
Power flUe installation instrUCtions
fig 15
SUITABLE
FIXING SCREW
FIXING SLOTS
IN HEATER FRONT
fig 16
EXTERNAL WALL
FLUE
TERMINAL
WALL FIXING:
USE SUITABLE FASTENERS
FOR WALL CONSTRUCTION
TOP
TERMINAL COVER PLATE
TERMINAL COVER
PLATE PLACED TO
HAVE TERMINAL ON
AN INCLINE.
fig 19
fig 17
PVC Vent
PVC PiPe
flUe
terMinal
PVC aDaPtor
ClaMP
stainless steel PiPe
fig 18
Exhaust
Air intake
Содержание FITZIB-PMEXB
Страница 21: ...Cannon Fitzroy Inbuilt Power Flue 21 Notes...
Страница 22: ...22 Cannon Canterbury Freestanding Notes...
Страница 23: ...Cannon Canterbury Freestanding 23 Notes...