C&M Britony System II Plus 80 Nat Скачать руководство пользователя страница 8

Location
The boiler can be installed on any suitable internal wall. Provision
must be made to allow the correct routing of the flue and siting of the
terminal to allow the safe and efficient removal of the flue products. A
compartment or cupboard may be used provided that it has been
purpose-built or modified for the purpose. It is not necessary to
provide permanent ventilation for cooling purposes. Detailed
recommendations are given in BS 5440 pt 2. If it is proposed that it is
installed in a timber framed building then reference must be made to
British Gas Document DM2, or advice sought from CORGI.

Flue

Detailed information on flue assembly is contained in the appropriate
starter pack.
The boiler must be installed so that the flue terminal is exposed to
the free passage of external air at all times. It must not be allowed to
discharge into another room or space such as an outhouse or closed
lean-to. The minimum acceptable clearances are shown below:

- A Directly below an opening, window, etc

300 mm

- B Above an opening, window, etc

300 mm

- C Horizontally to an opening, window, etc

300 mm

- D Below gutters, soils pipes or drain pipes

75 mm

- E Below eaves

200 mm

- F Below balconies or car port roof

200 mm

- G From a vertical drain pipe or soil pipe

150 mm

- H From an internal or external corner

300 mm

- I Above ground roof or balcony level

300 mm

- J From a surface facing the terminal

600 mm

- K From a terminal facing the terminal

1200 mm

- L From an opening in the car port into the dwelling

1200 mm

- M Vertically from a terminal on the same wall

1500 mm

- N Horizontally from a terminal on the same wall

300 mm

- Q Fixed by Ubbink Rolux 4 GM flue terminal

It may be necessary to protect the terminal with a guard. Reference
should be made to the Building Regulations for guidance. Suitable
guards may be obtained from the following manufacturer: 

Quinnel Barret & Quinnel Wireworks
Old Kent Road
London SE15 1NL
Tel: 0171 639 1357

Ventilation
The room in which the boiler is installed does not require specific
ventilation. 

If it is installed in a cupboard or compartment permanent

ventilation is not required for cooling purposes.

Gas Supply
The gas installation and soundness testing must be in accordance
with the requirements of BS 6891.The boiler requires a 22 mm
supply. Ensure that the pipe size is adequate for demand including
other gas appliances on the same supply.

Electrical Supply
The appliance requires an earthed 230V - 50 Hz supply and must
be in accordance with current I.E.E. Regulations. It must also be
possible to be able to completely isolate the appliance electrically.
Connection should be via a 3 amp fused double-pole isolating
switch with contact separation of at least 3 mm on both poles.
Alternatively, a fused 3 Amp. 3 pin plug and unswitched socket
may be used, provided it is not used in a room containing a bath or
shower. It should only supply the appliance.

8

6

7

Please check that you are familiar with the installation

requirements before commencing work.(section 6)

Installation 
The installation kit included with the flue components
comprise following items :
- Hanging bracket
- A paper template (showing the dimensions of the boiler

with 5 mm side clearances and fitting instructions)

- Connection tails
- Screws and wall plugs 
- Connection washers 
- Pre-piping jig
- Installation manual
The 22 mm copper tail to connect the cylinder coil to the

Britony II System Plus is located in the box of the boiler.

Method of positioning the boiler on the wall.
The paper template can be used to ensure the correct
positioning of kitchen cabinets etc. It also details the
commissioning instructions.
The paper template has to be fixed to the wall and used to
fix the position of the hanging bracket, the centre for the
flue hole and, if required, the fixings for the pre-piping jig.

Drill and plug the wall and secure the hanging bracket
using the screws provided. Remove the boiler from its
packaging as shown in fig. 9 and remove the outer case
as shown in fig.10.
Place the boiler on the wall on the hanging bracket.after
removing the pre-installation jig.

Fig. 8

A

B

G

H

J

C

L

M

N

K

I

D,E

F

Q

H

N

M

Q

Q

I

Installation Requirements

Installing the Boiler

                   

Содержание Britony System II Plus 80 Nat

Страница 1: ...nder Fanned Flue system Installation and Operating instructions These instructions Must Be Left With The Appliance Manufactures N Model Type Gas Council N 200907815037 31 Britony System II Plus 80 Nat...

Страница 2: ...to contact an engineer then telephone the national warranty helpline 0870 600 9888 Advice on installation or servicing can also be obtained by contacting the Chaffoteaux Technical Department Tel 0870...

Страница 3: ...ic ignition and is suitable for use with all modern electrical control systems The boiler is designed for sealed systems only and a circulating pump expansion vessel together with a pressure gauge and...

Страница 4: ...2 Overheat sensor 13 Flue hood with fan 14 Central heating control thermistor 15 Three position Selector switch Pilot O Hot water only Hot water Central heating 16 Primary circuit control thermistor 1...

Страница 5: ...t3 h 37 44 8 Inlet pressure Nominal in mbar 37 37 Nominal in in wg 14 8 14 8 Burner pressure Nominal in mbar 35 30 4 Nominal in in wg 14 12 2 BUTANE L P G G30 Gas rate Maximum in kg h 2 04 2 45 Maximu...

Страница 6: ...quired 450 Height 850 Depth 380 All dimensions in mm Safety valve center line Minimum clearances Both sides 5 mm Above casing 170 mm Below casing 200 mm Front for servicing 500 mm Front in operation 5...

Страница 7: ...o supply central heating the selector switch 15 fig 6 must be in position This will be confirmed by the green indicator light 18 fig 6 When there is a demand for heating either from the room thermosta...

Страница 8: ...d does not require specific ventilation If it is installed in a cupboard or compartment permanent ventilation is not required for cooling purposes Gas Supply The gas installation and soundness testing...

Страница 9: ...sing washers provided in the plastic bag 3 x fibre washers for the water pipes 1 x washer mesh filter F CH return connection 1 x rubber washer R for gas connection Provision must be maid to reduce as...

Страница 10: ...ire If using a room thermostat or other external control they can be connected in place of the link on the multipin plug C fig 15 Note Use only controls designed for voltage free switching or 24V supp...

Страница 11: ...timed A simple time clock can be used such as the Danfoss Randall 103 P 1 2 Cylinder Thermostat N L P 1 Thermal Cut Out Main Boiler Connector Interface PCB N L 1 2 3 N PH 1 3 2 N PH LINK 4 5 6 H W C H...

Страница 12: ...switch 15 fig 17 to heating and hot water position Turn the boiler thermostat to maximum 16 fig 17 The boiler will light Allow the boiler to heat system Check the inlet gas pressure working pressure...

Страница 13: ...ler is fitted with a pre adjusted by pass Although adjustment is not normally necessary the by pass can be reset by turning screw D Fig 18 anticlockwise to open the by pass using the chart below for g...

Страница 14: ...heat the orange burner on indicator will light and the heating will be on When the heating is on it will be interrupted while the cylinder is reheated The boiler will switch back automatically to hea...

Страница 15: ...15 Notes...

Страница 16: ...in this document Manufacturer Chaffoteaux Maury France Commercial subsidiary MTS GB Limited MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Internet...

Отзывы: