background image

10  

Operation During A Power Failure 

In the event of a power failure, the valve will keep track of the time and day for 48 hours.  

The programmed settings are stored in a non-volatile memory and will not be lost during a 
power failure.  If power fails while the unit is in regeneration, the valve will finish regenera-
tion from the point it is at once power is restored.  If the valve misses a scheduled regener-
ation due to a power failure, it will queue a regeneration at the next regeneration time once 

power is restored. 

Main Display 

The main display will pause on the Date and Time page for 5 seconds.  Then it will continu-

ally scroll through all of the system diagnostic display pages.  To manually scroll through the 
diagnostics,  press  the  down  or  up  key.    To  reset  the  TOTAL  REGENS,  TOTAL  GALLONS 
OVER RUN TOTAL, or PEAK flow rates, press and hold the MANUAL REGEN key until the val-
ue changes to zero. 

The brine tank is equipped with a safety float which prevents your brine tank from overfill-

ing as a result of a malfunction such as a power failure.  

Safety Float 

About The System 

PARAMETER

DESCRIPTION

JULY/17/2012

8:30 PM

TOTAL 1,500 GAL

REMAIN 1,200 GAL

PEOPLE 2

RESERVE 150 GAL

EST. DAYS TO NEXT

REGEN 06 DAYS

LAST REGEN

9/24/12

TOTAL REGENS

10

TOTAL GALLONS

001590 GAL

OVER RUN TOTAL

0500 GAL

CURRENT 1.5 GPM

PEAK 6.5 GPM

DELAYED REGEN

OFF

REGEN TIME

2:00 AM

REFILL TIME

3:00 MIN

VALVE MODE

SOFTENER UF

TOTAL 4 DAYS

REMAIN 3 DAYS

Month, Day, Year, Time

The current calculated refill time.  (Note:  The refill time shown will be reduced by the pre-fill 
%.  i.e. If pre-fill % is 70%, then displayed refill time will be 70% of the full target.)

The current setting for regeneration time.

Number of people in the household and the calculated reserve capacity.  When remaining 
reaches reserve capacity a regeneration will be scheduled.

The number of days remaining before regeneration.  This option is only in filter mode.

The total amount is the system capacity when fully regenerated.  The remaining is the 
capacity left in the system.

The estimated number of days until the next regeneration will occur.

The date of the last regeneration.

The total number of regenerations.

The total amount of gallons treated by the system.

The total amount of water that has exceeded the system capacity over the last 4 
regenerations.  When remaining goes to zero, the gallons used will be added to over run total.
The current flow rate and the peak flow rate since the last regeneration.

Advises whether a delayed regeneration has been scheduled manually or automatically.

The current setting of the valve mode.

Diagnostic Display 

Содержание 185DF Series

Страница 1: ...E WARRANTY BEFORE YOU BEGIN INSTALLATION READ THIS ENTIRE MANUAL THEN OBTAIN ALL THE MATERIALS AND TOOLS 1 Avoid pinched O rings during installation by applying provided with install kit NSF certified...

Страница 2: ...g water that is microbiologi cally unsafe or of unknown quality without adequate disinfection before or after the system For your safety the information in this manual must be followed to minimize the...

Страница 3: ...re may exceed the maximum Use a pressure reducing valve to reduce the pressure Softener resins may degrade in the pres ence of chlorine or chloramines above 2 ppm If you have chlorine or chloramines i...

Страница 4: ...fficiency Salt Used Per Regeneration 2 3 lbs 3 0 lbs 2 3 lbs 3 0 lbs 3 75 lbs 6 0 lbs 9 0 lbs Water Used Regeneration 22 7 gal 28 3 gal 22 6 gal 31 6 gal 39 5 gal 60 9 gal 102 2 gal Hardness Removal G...

Страница 5: ...hed 6 foot power cable Extension cables are available Be sure the electric outlet and transformer are in an in side location to protect from wet weather If installing in an outside location you must t...

Страница 6: ...his could cause damage to the valve 5 Connect the drain hose 10 ft included to the valve and secure it with a hose clamp also included Run the drain hose to the nearest laundry tub or floor drain This...

Страница 7: ...7 Installation Twin Tank...

Страница 8: ...Allow the valve to refill for the full amount of time as dis played on the screen to insure a proper brine solution for the next regeneration 7 The valve will automatically advance to the SERVICE posi...

Страница 9: ...need to maximize your capacity but still operate the system with good efficiency Choose IRON MN if you have problem water containing these minerals The high salt setting will be needed since these mi...

Страница 10: ...EXT REGEN 06 DAYS LAST REGEN 9 24 12 TOTAL REGENS 10 TOTAL GALLONS 001590 GAL OVER RUN TOTAL 0500 GAL CURRENT 1 5 GPM PEAK 6 5 GPM DELAYED REGEN OFF REGEN TIME 2 00 AM REFILL TIME 3 00 MIN VALVE MODE...

Страница 11: ...table below explains the regeneration steps Regeneration Process and Precision Brining System Configuration Step Name Description 1 Brine The brine solution is introduced slowly to the tank flowing do...

Страница 12: ...only NUGGETor PELLET water softener salt Check the salt level monthly It is im portant to maintain the salt level above the water level To add salt simply lift the salt lid and add the salt directly...

Страница 13: ...ontrol valve body 3 Carefully remove the assembly and disassemble as shown in above figure 4 The injector orifice is removed from the valve body by carefully turning it out with a large screwdriver Re...

Страница 14: ...t the BLFC holder apart and remove the flow washer 4 Reassemble using the reverse procedure TIP Markings on the BLFC washer should face the direction as shown here Replacing Drain Line Flow Control DL...

Страница 15: ...a to form or grow However during shipping storage installing and operating bac teria could get into the softener For this reason sanitizing as follows is suggested when in stalling Sani System Liquid...

Страница 16: ...Quantity 60010020 3 4 NPT ELBOW A 2 60010019 1 NPT STRAIGHT A 2 60010023 3 4 NPT STRAIGHT A 2 60010079 VALVE COUPLING INLET B 1 60010101 VALVE COUPLING OUTLET METER SIDE C 1 60010025 PLASTIC SECURE C...

Страница 17: ...STON ASSEMBLY 60010035 INJECTOR SET 00 VIOLET 60010130 85HE SEAL SPACER KIT 60010034 INJECTOR SET 0 RED 60010131 85HE DLFC 1 1 5 GPM 60010033 INJECTOR SET 1 WHITE 60010132 85HE DLFC 2 2 0 GPM 60010032...

Страница 18: ...1 5030013 O Ring 30 2 65 A20 1 5056063 O Ring 78 74 5 33 A21 1 26010103 O Ring 25 3 55 A22 1 7060007 Valve Bottom Connector A23 1 13000426 Screw ST2 9X13 Large Washer A24 2 5031022 O Ring 32 3 A25 1...

Страница 19: ...19 Power Head Exploded View...

Страница 20: ...Drive Gear B08 1 13000426 Screw ST2 9X13 Large Washer A24 2 5056139 Washer 3x13 B09 1 5030007 BNT85 Main Gear B10 1 5030005 BNT185 Housing B11 1 5031017 BNT85HE Brine Gear Downflow B12 1 5010023 Magn...

Страница 21: ...ne flow control DLFC button Check for proper flow rate 1 Plugged injector or screen Clean parts 2 Valve not regenerating Replace circuit board motor or control 3 Foreign material in brine valve Clean...

Страница 22: ...d shall be from the date thereof Life Time Warranty on Mineral Tanks and Brine Tanks WaterGroup will provide a replacement mineral tank or brine tank to any original equipment purchaser in possession...

Отзывы: