6. Operation

6. Operation

.35.

.34.

6.5.11.1 Model Select

There are 4 settings in this menu as below:

1.OFF 2.Meter in Load 3.Meter in Grid 4.Current sensor

Figure 6.23

ON=<ENT>  CANCEL=<ESC>

Meter in Load

6.5.11.1.2 Meter in Load

The submenu is used to set meter in Load as shown as 4.3.7 Meter connection(optional).

Figure 6.24

ON=<ENT>  CANCEL=<ESC>

Meter in Grid

6.5.11.1.3 Meter in Grid

The submenu is used to set meter in Grid as shown as 4.3.7 Meter connection(optional).

Press Enter key to save the setting.

Press Enter key to save the setting.

Figure 6.25

ON=<ENT>  CANCEL=<ESC>

Current Sensor

6.5.11.1.4 Current sensor

The submenu is used to set current sensor as shown as 4.3.8 CT connection(optional).

There are 2 modes shown as below: 1.CT Sampling Ratio 2.CT Link test

Figure 6.22 

ON=<ENT>  CANCEL=<ESC>

OFF

Press the ENTER key to set 

d

one. 

Press the ESC key to the previous menu.

This function is used to shut down the Export Power Set.

6.5.11.1.1 OFF

6.5.11.1.4.1   CT Sampling Ratio 

This

 

function

 

is

 

used

 

for

 

change

 

 CT  Sampling Ratio

 

if

 

customer

 

select

 

different

 

CT

.

The

 

default

 

radio

 

is

 

3000

:

1

.

 

-> CT  Sampling Ratio 

Figure 6.26 Set the CT Para  of the EPM

Figure 6.27

YES=<ENT>  NO=<ESC>

Ratio:3000:1

Press the UP/DOWN keys to set data.Press the ENTER key to set 

CT Para

Press the ESC key to save the settings and return to the previous menu.

Figure 6.28 CT  Link  State

CT  Link  State

Correct

  

 Press the ESC key to the previous menu.

Press the  ENTER key to show  the screen of CT Link Test .it  will show as below when 

the EPM was set ON :

NOTE:

There are three states in the CT Link State.
“Error” means CT reverse connection. Please change CT direction
“Can not judge” means load power is not enough, it should be more than 500W.
“Correct” means CT has been connected correctly.

Before pressing the CT Link Test menu, please check as follow:
1.

Load power 

 500W

2.Inverter should be  set Grid Off
3.CT should be  connected 
4.EPM should be set ON

6.5.11.1.4.2   CT Link Test

Содержание CSI-700TL1P-GI-FL

Страница 1: ...AN SOLAR USA INC North America Headquarters 3000 Oak Road Ste 400 Walnut Creek CA 94596 Tel 1 888 998 7739 Sales Inquiries Email sales us canadiansolar com Technical Inquiries Email service ca canadia...

Страница 2: ...6 Operation 24 5 Start Stop 5 1 Start the Inverter 5 2 Stop the Inverter 23 23 23 1 1 Product Description 3 1 2 Packaging 4 4 3 1 Connect PV side of inverter 13 4 3 2 Connect grid side of inverter 16...

Страница 3: ...tions 38 38 41 32 6 5 11 Export Power Set 6 5 9 Restore Settings 6 5 10 HMI Update 6 4 8 Warning Message 29 37 6 5 12 Restart HMI 6 5 13 Debug Parameter 6 5 14 DSP Update 6 5 15 Power Parameter 37 37...

Страница 4: ...important safety instructions which if not correctly followed could result in some damage or the destruction of the inverter 2 1 Safety Symbols Safety symbols used in this manual which highlight pote...

Страница 5: ...e solar panel s DC isolator shall be switched off 6 CAUTION The PV array Solar panels supplies a DC voltage when they are exposed to sunlight CAUTION Risk of electric shock from energy stored in capac...

Страница 6: ...ations 8 Figure 4 1 Recommended Installation locations To select a location for the inverter the following criteria should be considered Do not install in small closed spaces where air can not circula...

Страница 7: ...nverters are installed in one location a minimum 12inchs clearance should be kept between each inverter or other object The bottom of the inverter should be 20inchs clearance to the ground Visibility...

Страница 8: ...the inverter Figure 4 6 DC Connector Figure 4 7 DC Connector WARNING The inverter must be mounted vertically 4 Lift up the inverter be careful to avoid body strain and align the back bracket on the in...

Страница 9: ...nnector cap nut and contact pin Figure 4 8 Disassemble the Connector Cap nut Figure 4 9 Insert the Wire into the Connector Cap nut and contact pin iii Crimp the contact pin to the wire using a proper...

Страница 10: ...to assemble the AC grid terminal connectors are listed as follows a Disassemble the AC connector Strip the AC wires about 6mm Figure 4 15 Stripped AC Wires c Tighten up the cap on the terminal see Fig...

Страница 11: ...t GPRS monitoring Wi Fi monitoring Smart phone monitoring PC monitoring Web server Router Wi Fi monitoring Wi Fi box To protect the inverter s AC grid connection conductors Canadian Solar recommends i...

Страница 12: ...consumers mains and the solar supply 2 More than one RCD may be used Each RCD can protect one or more circuits Refer to figure 4 21 which is a simple guidance for installing a solar system with PV in...

Страница 13: ...Inverter power limited by over grid voltage LimByVar Inverter power limited by generating reactive power When inverter working normally there would be 5 status Logic interface is required by G98 and G...

Страница 14: ...Current of EPM 10 sec Work Mode The work mode of inverter DRM Number Show the number 01 08 Work Mode NULL DRM Number 08 10 sec Meter EnergyP The active power Meter EnergyP 0000000 00kWh 6 1 Main Menu...

Страница 15: ...password the Main Menu will display a screen and be able to access to the following information 1 Alarm Message 2 Running Message 3 Version 4 Daily Energy 5 Monthly Energy 6 Yearly Energy 7 Daily Reco...

Страница 16: ...reen shows the internal data of the Inverter see Figure 6 14 which is for service technicians only 01 05 01 25 E4 9D AA 06 10 C2 B5 E4 9D 55 Figure 6 14 Communication Data Press DOWN key to move the c...

Страница 17: ...d User Def function Press the ENTER key to confirm the setting Press the ESC key to cancel changes and returns to previous menu Selecting the User Def menu will access to the following submenu see Fig...

Страница 18: ...set 4 10mins OV G V set 5 Initial Settings This function is applicable by maintenance personnel only wrong operation will prevent the inverter from working properly 6 5 8 1 Enable logic interface set...

Страница 19: ...This function is used to shut down the Export Power Set 6 5 11 1 1 OFF 6 5 11 1 4 1 CT Sampling Ratio This function is used for change CT Sampling Ratio if customer select different CT The default ra...

Страница 20: ...t setting is ON 6 5 12 Restart HMI 6 5 13 Debug Parameter This function is used for manufacturer maintenance personnel only The function is used for restart the HMI This function is applicable by main...

Страница 21: ...otection limit if it s allowed by electrical company 1 Check connections and grid switch 2 Check the grid voltage inside inverter terminal 1 Reduce the module number in series 1 Restart inverter 2 Cha...

Страница 22: ...Leak PRO 01 02 03 04 Leakage current protection RelayChk FAIL Relay check fail 41 40 8 Trouble Shooting 47 52 or 57 62 Max DC input voltage Volts Rated DC voltage Volts MPPT voltage range Volts Max in...

Страница 23: ...rtz 8 5kg 50 500 3 47 52 or 57 62 Max DC input voltage Volts MPPT voltage range Volts Max input current Amps MPPT number Max input strings number Rated grid voltage Volts Rated output current Amps Pow...

Страница 24: ...frequency Hertz 3 47 52 or 57 62 Max DC input voltage Volts MPPT voltage range Volts Max input current Amps MPPT number Max input strings number Rated grid voltage Volts Rated output current Amps Powe...

Страница 25: ...rating surroundings humidity 310W 373H 160D mm 600 11 17 2 1 1 220 230 0 8leading 0 8lagging 50 60 97 5 96 8 99 5 8 8kg Transformerless IP65 20 dBA Natural convection 4000m 20 years 25 60 Display Moni...

Страница 26: ...and are properly ventilated Completed 5 Serial number Record the product serial numbers located on the side label Serial Numbers attached list 6 Solar modules Confirm PV module installation completion...

Страница 27: ...es CSI xx KTL GI 1 Switch the grid supply main Switch AC ON first 2 Switch the DC switch ON If the voltages of PV arrays are higher than start up voltage the inverter will turn on The red LED power wi...

Страница 28: ...using the front panel interface Completed Record current date time in Notes 6 Communication setting if avail Set communication with a unique address for each inverter Completed Record address in Notes...

Страница 29: ...t Output power Input DC voltage Insulation limit K PV start up voltage Grid V Max V Min Frequency Max Min Reactive compensation PF Configuration MPPT Individual MPPT Parallel Monitoring RS485 Ethernet...

Страница 30: ...ter site selection and installation 3 PHASE STRING INVERTERS KTL SERIES CSIF ST 016 A 0 INSTALLER S NAME INSTALLER S SIGNATURE COMPANY DATE Inverter serial numbers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15...

Отзывы: