Subsection 11 (CONTINUOUSLY VARIABLE TRANSMISSION (CVT)(570/850))
SPRING FREE LENGTH
ALL
ENGINES
Service limit
125 mm (4.921 in)
CLUTCH SPRING SQUARENESS
ALL
ENGINES
Service limit
3.8 mm (.15 in)
Assembling the Driven Pulley
For installation, reverse the removal procedure.
Pay attention to following details.
Heat ball bearing area up to 100°C (212°F) before
ball bearing installation.
NOTE:
Place new ball bearing in a freezer for 10
minutes before installation.
Install ball bearing with the writing on top and
press it in using only the outer race.
vmr2006-021-042_a
1. Ball bearing
2. Fixed sheave of driven pulley
NOTICE
Do not use a hammer, bearing must
be pressed in only.
2
R610tran37A
1
3
1. Shaft
2. Fixed sheave
3. Press machine
Install torque gear then secure it with the retaining
ring.
vmr2006-021-035_a
1. Retaining ring
2. Torque gear
3. Fixed sheave of driven pulley
Installing the Driven Pulley
For installation, reverse the removal procedure.
Pay attention to the following details.
Place O-ring on countershaft splines and move it
and the distance sleeve into position.
NOTICE
Chamfer on inside diameter of the
distance sleeve must face to gearbox side.
vmr2006-021-044_a
1. O-ring
2. Distance sleeve
3. Chamfered area of distance sleeve
NOTICE
Threads of gearbox countershaft
and driven pulley screw must be free of oil
and grease. Lubricants in threads will create
too high preload to tightened driven pulley
screw.
Clean threads using
PULLEY FLANGE CLEANER
(P/N 413 711 809)
.
18
vmr2016-404