8.2
CHECKING THE CONSTRUCTION ............................................................................................................ 49
8.3
FIRE TESTING ........................................................................................................................................ 49
8.4
COMISSIONING APPLIANCE ................................................................................................................... 52
PART 9
TROUBLE SHOOTING ............................................................................................................................. 53
PART 10 MAINTENANCE ..................................................................................................................................... 60
10.1
EXAMINE THE VENTING SYSTEM ........................................................................................................... 60
10.2
VISUALLY CHECK MAIN BURNER FLAMES .............................................................................................. 60
10.3
FLUE GAS PASSAGEWAYS CLEANING PROCEDURES ............................................................................... 60
10.4
CONDENSATION TREATMENT ............................................................................................................... 60
10.4.1
CONDENSATE VOLUME ......................................................................................................................... 60
10.5
BURNER MAINTENANCE ........................................................................................................................ 61
10.5.1
BURNER REMOVAL AND CLEANING ....................................................................................................... 61
10.5.2
BURNER CLEANING PROCEDURE ........................................................................................................... 61
10.6
CHANGING THE HOT SURFACE IGNITER ................................................................................................. 61
10.6.1
RE-INSTALLING THE IGNITER ................................................................................................................. 62
10.7
PRIMARY HEAT EXCHANGER INSPECTION .............................................................................................. 62
10.8
CONDENSING HEAT RECOVERY MODULE (CHRM) INSPECTION .............................................................. 62
10.9
RE-INSTALL HEAT EXCHANGERS............................................................................................................. 62
10.10
COMBUSTION AIR FAN .......................................................................................................................... 62
10.11
COMBUSTION AND VENTILATION AIR ................................................................................................... 62
10.12
CONTROL CIRCUIT VOLTAGE ................................................................................................................. 62
10.13
COMBUSTIBLE MATERIALS .................................................................................................................... 62
10.14
FREEZE PROTECTION ............................................................................................................................. 62
10.15
FREEZE PROTECTION FOR A HEATING BOILER SYSTEM (Optional) ......................................................... 63
PART 11 INSTALLATIONS ..................................................................................................................................... 63
11.1
HEATING BOILER INSTALLATIONS .......................................................................................................... 63
11.2
WATER CONNECTIONS .......................................................................................................................... 63
11.3
PIPING LENGTHS ................................................................................................................................... 63
11.4
INTERMITTENT PUMP OPERATION ........................................................................................................ 64
11.5
SUMMARY ............................................................................................................................................ 64
11.6
DOMESTIC HOT WATER HEATER............................................................................................................ 64
11.7
WATER VELOCITY CONTROL .................................................................................................................. 64
11.8
TEMPERATURE RISE AT FULL FIRING RATE ............................................................................................. 65
11.9
WATER HEATERS ................................................................................................................................... 65
PART 12 EXPLODED VIEW ................................................................................................................................... 66
PART 13 ELECTRICAL DIAGRAMS ......................................................................................................................... 77
WARRANTY ........................................................................................................................................................... 83
Содержание DFH/W500
Страница 2: ......
Страница 40: ...35...
Страница 71: ...66 PART 12 EXPLODED VIEW...
Страница 72: ...67 3 44 10 45 46 47 28 31 26 52 57 58 59 54 60 61 SOLA Control Panel 39 4...
Страница 82: ...77 PART 13 ELECTRICAL DIAGRAMS...
Страница 83: ...78...
Страница 85: ...80...
Страница 86: ...81...
Страница 87: ...82...