![Campbell SkyVUE 8 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/campbell/skyvue-8/skyvue-8_product-manual_3808856027.webp)
4. Installation
4.6 Connecting the back-up battery
4.1 Location and orientation
The SkyVUE 8 measures environmental variables and is designed to be located in harsh weather
conditions. However, there are a few considerations to take into account if accurate and
representative data from a site are to be obtained.
To reduce the service frequency with the unit, place the SkyVUE 8 away from sources of
contamination. More regular maintenance will be required when the instrument is placed in
areas where contamination is unavoidable or where measurements may be safety related.
Take care that the orientation allows tilting in whatever direction is desired.
WARNING:
If installing at an airport, check and follow local guidance for allowed locations for a non-
frangible object 1 m (3.2 ft) tall. Please contact Campbell Scientific if frangible fittings are
required.
4.2 Grounding
The SkyVUE 8 must be properly grounded by taking a ground wire with a minimum cross
sectional area of 16 mm
2
(0.62 in) and maximum length of 10 m (32.8 ft) from the brass
grounding boss to an adequate grounding point.
(p. 10)) shows the location of the
grounding boss.
SkyVUE™8 (CS136) LIDAR Ceilometer
15
Содержание SkyVUE 8
Страница 1: ...Revision 08 2020 Copyright 2019 2020 Campbell Scientific CSL I D 1301...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 108: ......
Страница 112: ...SkyVUE 8 CS136 LIDAR Ceilometer 99...
Страница 115: ......