2-1

Section 2.  ET Tower Installation

DANGER:

  Do not install near power lines.  If any part of the tower comes in contact with

power lines you could be KILLED.  Contact local utilities for the location of buried utility
lines before digging or driving grounding rods.

CAUTION:

  Do not fit the 3 meter ET Tower sections together until the appropriate time.

Once attached, they cannot be detached.

The ET Tower provides a support structure for mounting the ET101 and ET106 weather
station components.  Figure 2.1-1 shows a typical ET Tower installation option.  The
tower is designed to withstand winds of 100 mph.  The lightning rod assembly is attached
after the instrumentation enclosure is installed (Section 3.1).

Transformer

User Supplied 
Junction Box

110 VAC

16 VAC
Power

Valve Box

Communications
Line

Direct Bury
Splices

Concrete
Base

Ground
Rod

ET Tower

FIGURE 2.1-1.  ET Tower Installation

2.1  Base Installation

2.1.1  Supplied Components

(3) ½ inch L-Bolts
(9) ½ inch Nuts
(1) Anchor Template

Refer to Section 1 for components supplied by installer.

Содержание ET106

Страница 1: ...INSTRUCTION MANUAL ET106 Weather Station Revision 9 02 C o p y r i g h t c 1 9 9 3 2 0 0 2 C a m p b e l l S c i e n t i f i c I n c...

Страница 2: ...er warranties expressed or implied including warranties of merchantability or fitness for a particular purpose CAMPBELL SCIENTIFIC INC is not liable for special indirect incidental or consequential da...

Страница 3: ...on Installation 3 1 3 1 Enclosure Datalogger Power Supply 3 2 3 2 Sensor Connection 3 5 3 3 Communication and Data Storage Peripherals 3 6 3 4 Sealing and Desiccating the Enclosure 3 12 4 ET106 Sensor...

Страница 4: ...This is a blank page...

Страница 5: ...r communications device and power supply in enclosure Section 3 Install datalogger support software on PC Section 5 Establish communications between the datalogger and the PC Section 5 Program datalog...

Страница 6: ...Tools Required Tools required to install and maintain a weather station are listed below 1 2 1 Tools for Tower Installation All Towers Shovel Rake Open end wrenches 3 8 7 16 2 9 16 Magnetic compass 6...

Страница 7: ...als for B18 Base and UTEYE Anchors 4 Wood stakes 12 Pick or digging bar Concrete form materials 2 x 4 lumber stakes saw hammer nails etc Concrete trowel and edger Materials for UTDUK Duckbill Anchors...

Страница 8: ...flon tape or pipe dope 12 1 4 washers for the 015 Crossarm stand only Allen wrench set UT30 Tape measure 12 to 20 3 8 nut driver Level 36 to 48 Pliers Climbing harness Hard hats 50 haul rope Crescent...

Страница 9: ...peed and Direction Wind sensors should be located over open level terrain and at a distance of at least ten times EPA the height of any nearby building tree or other obstruction as illustrated in Figu...

Страница 10: ...ation The gage must be mounted above the average level of snow accumulation in areas that experience significant snowfall Standard measurement heights 1 0 m 1 0 cm AASC 30 0 cm minimum WMO EPA 1 3 4 S...

Страница 11: ...een True North and Magnetic North Magnetic declination for a specific site can be obtained from a USFA map local airport or through an internet service called NSSDC CGM Section 1 4 1 A general map sho...

Страница 12: ...de of your site fill out Form 1as shown below for an accurate magnetic declination If you do not know the latitude and longitude of your site fill out Form 2 for estimate of magnetic declination Note...

Страница 13: ...its location in the table A positive declination is east while a negative declination is west The declination in this example is 14 417 degrees As shown in Figure 1 4 1 the declination for Logan UT i...

Страница 14: ...orological Instruments and Methods of Observation World Meteorological Organization No 8 5th edition Geneva Switzerland 3 The State Climatologist 1985 Publication of the American Association of State...

Страница 15: ...ort structure for mounting the ET101 and ET106 weather station components Figure 2 1 1 shows a typical ET Tower installation option The tower is designed to withstand winds of 100 mph The lightning ro...

Страница 16: ...conduit Make certain the cavity points in the direction from which power and communications cables will come 6 Center the form over the hole Adjacent to the form drive four stakes into the soil Secur...

Страница 17: ...Section 1 for components supplied by installer 2 2 2 Installation Attach the tower to the base as shown in Figure 2 2 1 1 Dig a hole close to the concrete base to access the lower conduit opening From...

Страница 18: ...lower it onto the conduit and mounting bolts Install a washer and nut on each bolt and hand tighten Check plumb of the tower by placing a level on the north and east sides of the lower tower section A...

Страница 19: ...he foundation using a fence post driver or sledge hammer Drive the rod at an angle if an impenetrable hardpan layer exists Soften hard clay soils with water if necessary 3 Strip 1 inch of insulation f...

Страница 20: ...Section 2 ET Tower Installation 2 6 This is a blank page...

Страница 21: ...are mounted in the ET enclosure at the locations shown in Figure 3 1 Components include 1 ET Enclosure 1 4 unit Desiccant Pack 1 Flat Point Screw Driver 1 Power Supply Option 1 Telecommunications Opti...

Страница 22: ...NAL BATTERY MADE IN USA 12V ALKALINE BATTERY PACK BPALK Logan Utah TEMPORARY BATTERY FIGURE 3 1 1 Alkaline Power Mounting and Connections YUASA FIGURE 3 1 2 Rechargeable Power Mounting and Connections...

Страница 23: ...titude Tilt Angle 0 to 10 degrees 10 degrees 11 to 20 Latitude 5 degrees 21 to 45 Latitude 10 degrees 46 to 65 Latitude 15 degrees 65 80 degrees b After determining the tilt angle loosen the two bolts...

Страница 24: ...3 1 4 Mounting and Grounding the ET Enclosure c Slide the enclosure to the top of the ET tower Position it on the north side of the tower northern hemisphere The top of the enclosure should be flush w...

Страница 25: ...sure by removing the two Phillips head screws Sensors connect to one of seven labeled bulkhead connectors as shown in Figure 3 2 1 Earth Ground Stand off Connector 4 Sensors TEMP CS615 TEMP RAIN PRECI...

Страница 26: ...wired no further connections inside the enclosure are necessary Follow the External Installation procedures outlined below to make the external connections If you received a telecommunications kit sep...

Страница 27: ...dem ground port to the ET Enclosure ground with the 14 AWG ground wire 3 3 1 2 External Installation The following modem kit components are used to make the external connections 1 Direct Bury Splice K...

Страница 28: ...RJ11C Interface to the side of the battery bracket 3 Connect the modem 9 pin port to the ET Enclosure port with the blue 9 pin ribbon cable supplied with the ET Enclosure 4 Connect the modem RJ ll ja...

Страница 29: ...Connector normally not used Power Indicator do not press RJ11C Interface Coax Bulkhead Connector Battery Motorola M600 Transceiver COM200 or VS1 Telephone Modem Green Modem Ground Wire to Recessed GN...

Страница 30: ...s shown in Figure 3 3 3 2 Connect the antenna to the external coaxial bulkhead connector with the 9 foot antenna cable 3 3 3 Short Haul Modem Short haul modems enable communication between a datalogge...

Страница 31: ...h cord Match wire labels to wiring panel labels on both the ET Enclosure and the Rad Modem XMT to XMT etc A small screwdriver in provided with the ET Enclosure to access the Rad Modem connections 3 3...

Страница 32: ...ET106 ENCLOSURE ET106 ENCLOSURE To 8 External Connector Earth Ground C A M P B E L L S C I E N T I F I C L T D S C 9 3 2 S N E 1 0 5 5 Q C FIGURE 3 3 5 Short Haul Modem Wiring Diagram 3 4 Sealing and...

Страница 33: ...T 250 F DESICCANT ACTIVATED BAGGED FOR CONTENTS 4 UNITS PACKAGE USE AND STATIC DEHUMIDIFICATION DO NOT EAT UNITED DESICCANTS GATES 101CHRISTINE BELEN NEW MEXICO 87002 DESI PAK SPECIFICATION MIL D 3464...

Страница 34: ...Section 3 ET Instrumentation Installation 3 14 This is a blank page...

Страница 35: ...wind sensor attached Screws 4 FIGURE 4 2 1 ET106 Sensor Arm Mounting 1 Remove the cover from the ET Enclosure 2 Place the sensor arm on top of the enclosure lining up the four threaded holes on the un...

Страница 36: ...the 034A in the 034A Mounting Shaft pointing the vane due south Tighten the alignment screw 2 Attach the 034A and mounting shaft to the sensor arm Insert the mounting shaft into the U bolt clamp Adju...

Страница 37: ...l the bubble level indicates plumb Remove the red cap from the pyranometer FIGURE 4 6 1 Pyranometer Leveling 4 7 Soil Temperature Sensor Optional Bury the soil temperature sensor at the desired depth...

Страница 38: ...using the 5 mode with the CR10KD refer to the laminated prompt sheet 4 9 Upgrading an ET101 to an ET106 The ET101 can be upgraded to an ET106 by installing part number 10574 ET101 to ET106 Upgrade Kit...

Страница 39: ...Section 4 ET106 Sensor Arm Installation 4 5 Logan Utah MADE IN USA ET101 to ET106 FIGURE 4 9 1 Upgrading the ET101 to an ET106 FIGURE 4 9 2 Modifying the Pyranometer Plate...

Страница 40: ...p in troubleshooting Knowledge of the schematics is not necessary for routine installation and maintenance 1 2 3 4 5 6 Air Temperature and Relative Humidity Sensor Connector Pin Datalogger Relative Hu...

Страница 41: ...Excitation 10K OHM 10K OHM Potentiometer 1K OHM Datalogger Shield 1 2 4 P1 AG 2H E2 G G 5 6 1 2 3 4 5 6 FIGURE 4 10 2 Schematic of 034A LC Wind Speed and Direction Probe and Connector 2 Solar Radiatio...

Страница 42: ...lation 4 8 1 Not Used Connector Pin Magnetically Activated Reed Switch Tipping Rain Bucket Not Used Not Used Ground Pulse Datalogger Shield 2 4 3 P2 G G 5 6 1 2 3 4 5 6 FIGURE 4 10 4 Schematic of TE52...

Страница 43: ...20 manual 2 Create the ET datalogger program by clicking your mouse cursor on the main screen Edit then on Create Station Program Edit Create Station Program Follow the prompts until you return to the...

Страница 44: ...Section 5 ET Software Installation 5 2 This is a blank page...

Страница 45: ...ogger failure 6 1 2 Batteries Instruction 10 can be used to measure battery voltage By recording battery voltage the user can determine how long a fresh set of batteries will last see the Installation...

Страница 46: ...onditions 6 1 4 Sensor Maintenance Sensor maintenance should be performed at regular intervals depending on the desired accuracy and the conditions of use A suggested maintenance schedule is outlined...

Страница 47: ...he battery has been installed and the power switch if any is ON Section 7 B Use a voltmeter to measure the voltage on the 12 V and G terminals the voltage must be between 9 6 and 16 VDC C Disconnect a...

Страница 48: ...99999 Displayed in an Input Location A Make sure the battery voltage is between 9 6 and 16 VDC B With the MetData1 or ET106 verify that the sensor is connected to the proper bulkhead connector With c...

Страница 49: ...2 5 6999 or 99999 Stored in Final Storage or Storage Module A Final Storage format limitations exceeded any number larger than 6999 in low resolution or 99999 in high resolution format is stored as t...

Страница 50: ...Section 6 Maintenance and Troubleshooting 6 6 This is a blank page...

Страница 51: ...This is a blank page...

Страница 52: ...campbellsci com br suporte campbellsci com br Campbell Scientific Canada Corp CSC 11564 149th Street NW Edmonton Alberta T5M 1W7 CANADA www campbellsci ca dataloggers campbellsci ca Campbell Scientifi...

Отзывы: