Section 3. ET Instrumentation Installation
3-9
FIGURE 3.3-2. Cellular Phone Mounting and Connection
Green Modem
Ground Wire to
Modem “GND”
Terminal
Cellular Power
Connector
RJ11C
Patch Cord
Cellular Handset
Connector
(normally not used)
Power
Indicator
(do not press)
RJ11C Interface
Coax Bulkhead
Connector
Battery
Motorola M600
Transceiver
COM200 or VS1
Telephone Modem
Green Modem Ground
Wire to Recessed
“GND” Lug
Blue 9 Pin
Ribbon Cable
(1 Extra Connector)
Black Transceiver
Ground Wire to “GND”
Red Transceiver
12 Volt Wire
to “12 V”
Green Transceiver
Control Wire to“RCV+”
(Program Control Port 2)
Antenna Coax
Cable
Содержание ET106
Страница 4: ...This is a blank page...
Страница 20: ...Section 2 ET Tower Installation 2 6 This is a blank page...
Страница 34: ...Section 3 ET Instrumentation Installation 3 14 This is a blank page...
Страница 44: ...Section 5 ET Software Installation 5 2 This is a blank page...
Страница 50: ...Section 6 Maintenance and Troubleshooting 6 6 This is a blank page...
Страница 51: ...This is a blank page...