background image

ENC 8/10, ENC 10/12, ENC 12/14,        
ENC 14/16, ENC 16/18 and                    
AM-ENC/ENCT Enclosures 

This manual describes Campbell Scientific’s ENC 8/10, ENC 10/12, ENC 12/14, ENC 14/16, 
ENC 16/18 and AM-ENC/ENCT enclosures. This information should be used in conjunction 
with other information given in the datalogger or weather station manuals. 

1.  Description 

These enclosures are made of white fibreglass-reinforced polyester. The colour of 
the enclosure and the environmental sealing mean that there is no need for a 
conventional radiation/rain shield. The enclosures can be wall mounted as 
supplied, or pole mounted using the optional enclosure mounting brackets. The 
door is fitted with a catch which can accept a padlock if required. 

The enclosure is fitted with an anodised aluminium chassis plate which is punched 
with an array of holes. The holes accept plastic inserts for accepting screws for the 
attachment of power supplies, dataloggers and peripherals. These plastic fittings 
can easily be inserted by hand allowing the rapid mounting of components inside 
the enclosure. 

A small cable gland  is fitted to the base of the enclosure and a venting plug is 
fitted to this gland. The plug allows pressure equalisation between the inside and 
outside of the enclosure (which is required when using barometric or gauge 
pressure transducers) and also prevents pressure build-up in the enclosure in the 
event of a system failure when charging lead-acid batteries.  A blanking plug is 
supplied which can replace the porous venting plug, if this is not required. 

We recommend that sealed environmental connectors are used for the entry of 
sensor leads into the enclosure. However, a large cable gland is also fitted which 
can be used for the direct entry of one or more cables into the enclosure.  

An earthing boss is also provided for the connection of an external earth lead. 
Internally an earth wire is fitted which should be taken to the main earth point 
inside the enclosure (normally on the datalogger). 

Four bags of desiccant are supplied with the enclosure and are used to maintain a 
dry atmosphere inside the enclosure. 

2.  Installing Components in the Enclosure 

When the enclosure is bought as a configured system, the components will be pre-
fitted. If they are not fitted the convention is that the power supply (normally a 
PS100E) is mounted in the top of the enclosure (this is the end opposite to that 
where the cable glands are fitted). The datalogger is fitted next from the top and 
then any peripherals at the bottom. 

To fit the components, first work out exactly which holes are to be used and then 
push the nylon inserts into the holes in the chassis plate. A 3.5mm or 6-32 thread 
screw can then be screwed into the insert. Normally enough inserts and screws are 
supplied with each datalogger or enclosure to cater for all peripherals.  

Содержание AM-ENC

Страница 1: ...Enclosures ENC 8 10 ENC 10 12 ENC 12 14 ENC 14 16 ENC 16 18 and AM ENC ENCT Issued 6 9 17 Copyright 2000 2017 Campbell Scientific Ltd CSL 264 INSTALLATION MANUAL ...

Страница 2: ......

Страница 3: ...s under guarantee or not Please state the faults as clearly as possible and if the product is out of the guarantee period it should be accompanied by a purchase order Quotations for repairs can be given on request It is the policy of Campbell Scientific to protect the health of its employees and provide a safe working environment in support of this policy a Declaration of Hazardous Material and De...

Страница 4: ......

Страница 5: ...nt for recycling Any batteries contained within the product or used during the products life should be removed from the product and also be sent to an appropriate recycling facility Campbell Scientific Ltd can advise on the recycling of the equipment and in some cases arrange collection and the correct disposal of it although charges may apply for some items or territories For further advice or su...

Страница 6: ......

Страница 7: ...fore beginning work Wear a hardhat and eye protection and take other appropriate safety precautions while working on or around tripods and towers Do not climb tripods or towers at any time and prohibit climbing by other persons Take reasonable precautions to secure tripod and tower sites from trespassers Use only manufacturer recommended parts materials and tools Utility and Electrical You can be ...

Страница 8: ......

Страница 9: ...4 fitted with a power supply logger and multiplexer 2 7 1 An enclosure with the mast mounting option attaches to a tripod mast via u bolts 5 7 2 This exploded view shows the components of a mast mounting bracket 6 7 3 An enclosure attached to a tripod mast 6 7 4 Enclosure brackets configured for a tower mount 7 7 5 This exploded view shows the components of a tower mount bracket option 8 7 6 An en...

Страница 10: ...920 Terminal Strip installation A 2 A 3 15909 End Plate installation A 2 A 4 15909 Jumper installation A 3 A 5 DIN Rail bracket mounted onto an enclosure backplate A 3 A 6 An installed and wired 006706 002 DIN Rail Terminal Kit A 4 A 7 The 006706 002 DIN Rail Terminal Kit facilitates wiring of multiple sensors A 4 ...

Страница 11: ... transducers and also prevents pressure build up in the enclosure in the event of a system failure when charging lead acid batteries A blanking plug is supplied which can replace the porous venting plug if this is not required We recommend that sealed environmental connectors are used for the entry of sensor leads into the enclosure However a large cable gland is also fitted which can be used for ...

Страница 12: ...NC 12 14 fitted with a power supply logger and multiplexer The AM ENC enclosure will accept up to two AM16 32s or one older now superseded AM416 multiplexer If installing the DIN Rail Terminal Kit 010211 follow the procedure described in Appendix A The 006706 002 kit facilitates wiring when many wires need to be connected to one terminal 3 Power Supplies The enclosures are designed to accept the P...

Страница 13: ...he cables should be filled with a suitable mastic compound such as Plumbers Mate or silicone rubber compound Do not use bath or tile sealant which gives off corrosive fumes that can damage circuit boards Use proper electronic grade silicone rubber or plumber s putty 6 Desiccant The desiccant bags should be removed from the plastic bags in which they are shipped before placing them inside the enclo...

Страница 14: ...moisture adsorption or a container that prevents moisture from coming into contact with the regenerated desiccant Some care should be taken when re activating desiccant bags If heated in an oven which is too hot the bags may burst If in any doubt we recommend purchasing new desiccant packs instead of oven drying The enclosure is supplied with a humidity indicator card which provides a general indi...

Страница 15: ... the bottom of the enclosure see Figures 7 1 7 2 and 7 3 Attach the enclosure to the mast as follows 1 Position the enclosure on the north side of the mast 2 Use the furnished 62 mm centre u bolts to secure the enclosure to the tripod mast 3 Route the 14 AWG wire from the brass tripod grounding clamp to the enclosure grounding lug Strip one inch of insulation from each end of the wire and insert t...

Страница 16: ...C 8 10 ENC 10 12 ENC 12 14 ENC 14 16 ENC 16 18 and AM ENC ENCT Enclosures 6 Figure 7 2 This exploded view shows the components of a mast mounting bracket Figure 7 3 An enclosure attached to a tripod mast ...

Страница 17: ...wers adjust accordingly Attach the enclosure to a UT930 tower as follows 1 Remove the bolts and nuts connecting the bracket to the enclosure 2 Slide out the flange sections so that the distance between the centres of each flange is 43 cm see Figure 7 4 3 Reattach the bracket to the enclosure using the original bolts and nuts 4 Position the enclosure on the north side of the mast 5 Place the enclos...

Страница 18: ...NC 12 14 ENC 14 16 ENC 16 18 and AM ENC ENCT Enclosures 8 Flange Section Flange Section Figure 7 5 This exploded view shows the components of a tower mount bracket option Figure 7 6 An enclosure attached to two tower legs ...

Страница 19: ...ipped with the tripod and will need to be installed as shown in Figure 7 7 2 An ENC16 18 cannot be mounted to the leg base Attach the enclosure to the leg base as follows 1 Place the flange of the tripod s bracket into a notch in one of the enclosure s bracket see Figures 7 7 7 8 and 7 10 2 Attach the u bolt bracket on the other enclosure bracket see Figure 7 9 3 Use the furnished 70 mm centre u b...

Страница 20: ...ENC 8 10 ENC 10 12 ENC 12 14 ENC 14 16 ENC 16 18 and AM ENC ENCT Enclosures 10 Notch Figure 7 8 An ENC 14 16 enclosure with a leg mount bracket Figure 7 9 The u bolt bracket ...

Страница 21: ...brings with it additional problems such as adhesion It is important to note that any erosion is very superficial and has no effect on the physical characteristics electrical mechanical or chemical of the polyester Enclosures of the type supplied by Campbell Scientific have been successfully used outdoors since 1958 and tests on field samples support laboratory results These enclosures are maintena...

Страница 22: ...8 and AM ENC ENCT Enclosures 12 As of September 2009 all enclosures will be supplied with a special surface coating to reduce surface ageing No extra surface treating should be necessary unless the enclosures are exposed to extreme environments NOTE ...

Страница 23: ...t is mounted to an enclosure backplate using the kit s screws and grommets One 15920 terminal strip consists of three spring loaded guillotine terminals that provide connection points for individual wires Up to 20 of these terminal strips may be fastened to the 006706 002 DIN Rail bracket The 006706 DIN Rail bracket holds up to 36 The 15907 End Plates separate the terminal strips The 15909 Jumpers...

Страница 24: ...Appendix A DIN rail terminal kits A 2 Figure A 2 15920 Terminal Strip installation Figure A 3 15907 End Plate installation 2 Insert the 15909 Jumpers in the terminal strips as shown in Figure A 4 ...

Страница 25: ...s see Figure A 5 The 006706 includes three screws and three grommets Use the third screw and grommet to secure the 9 pin DIN Rail at its centre Figure A 5 DIN Rail bracket mounted onto an enclosure backplate 4 Connect the wires to the terminals see Figure A 6 and Figure A 7 The 8125 flat bladed screwdriver is used to open the terminals guillotines for wire entry NOTE ...

Страница 26: ...Appendix A DIN rail terminal kits A 4 Figure A 6 An installed and wired 006706 002 DIN Rail Terminal Kit Figure A 7 The 006706 002 DIN Rail Terminal Kit facilitates wiring of multiple sensors ...

Страница 27: ......

Страница 28: ...NW Edmonton Alberta T5L 4X4 CANADA www campbellsci ca dataloggers campbellsci ca Campbell Scientific Centro Caribe S A CSCC 300N Cementerio Edificio Breller Santo Domingo Heredia 40305 COSTA RICA www campbellsci cc info campbellsci cc Campbell Scientific Ltd CSL 80 Hathern Road Shepshed Loughborough LE12 9GX UNITED KINGDOM www campbellsci co uk sales campbellsci co uk Campbell Scientific Ltd Franc...

Отзывы: