p.
7
- M
an
ua
l
FA
010
82
-E
N
- 0
2/
20
18 - © C
AM
E S
.p
.A
. - T
ra
ns
la
tio
n o
f t
he o
rig
in
al i
ns
tru
ct
io
ns
Fastening the control panel
Fasten the control panel in a
protected area; use rounded cross head
screws with maximum 6 mm diameter.
maximum 6 mm diameter.
Perforate the punched holes.
Hole diametre: ø 20.
Be careful not to damage the control
board inside the casing.
Enter the cable gland with the
corrugated tubes for threading the
electrical cables.
Assembling the pressure hinge
Fit the hinges into the box (either on
the right or left) and fasten them using
the supplied screws and washers. They
slide to rotate.
Tools and materials
Make sure you have all the tools and materials you will need for installing in total safety and in compliance with applicable
regulations. The figure shows some of the equipment installers will need.
Содержание ZLJ14
Страница 43: ...p 19 Manual FA01082 EN 02 2018 CAME S p A Translation of the original instructions...
Страница 73: ...24 ZLJ14 RU FA01082 RU 24...
Страница 74: ...2 FA01082 RU 02 2018 CAME S p A 2006 42 CE 2006 42 CE CAME S p A...
Страница 75: ...3 FA01082 RU 02 2018 CAME S p A 1 5 III 50...
Страница 79: ...7 FA01082 RU 02 2018 CAME S p A 20...
Страница 84: ...B1 B2 2 FA FC S1 GND TS E E3 ES 1 2 3 3P 4 5 7 CX CY CZ 12 FA01082 RU 02 2018 CAME S p A USERS 500 A 24 RG58 F...
Страница 85: ...13 FA01082 RU 02 2018 CAME S p A 30...