6
T
h
e d
at
a a
n
d i
n
fo
rm
at
io
n p
rovi
d
ed
i
n
t
h
is
m
an
u
al
a
re to b
e c
o
n
si
d
er
ed
s
u
sc
ep
ti
b
le to c
h
an
g
e a
t a
n
y t
im
e w
it
h
o
u
t w
ar
n
in
g
, by CAM
E c
an
ce
ll
i a
u
to
m
at
ic
i S
.p
.A
.
ENGLISH
5.4 Fitting for unit base
The following applications are only examples, as the space required for unit installation and the accessories vary
depending on dimensions and therefore it is up to the installer to select the best solution.
- Assemble the four anchoring clamps at the base.
- Prepare a hole to house the fixing base and prepare
sheath tubes from the branch pit for the connections.
- Remove the nuts and washers from the threaded screws, position the cabinet
on the base in correspondence with the 4 threaded screws and secure with the
nuts and washers.
Note: We recommend installing the cabinet with the inspection hatch facing the
internal area.
- Fill the hole with concrete and immerge the clamps and the
fixing base, paying particular attention to the sheath tube which
must go through the hole at the base. The base must be perfectly
level, clean and with the screw threads fully on the surface.
Wait until everything is solidified – at least 24 hours.