7
T
h
e d
at
a a
n
d i
n
fo
rm
at
io
n p
rovi
d
ed
i
n
t
h
is
m
an
u
al
a
re to b
e c
o
n
si
d
er
ed
s
u
sc
ep
ti
b
le to c
h
an
g
e a
t a
n
y t
im
e w
it
h
o
u
t w
ar
n
in
g
, by CAM
E c
an
ce
ll
i a
u
to
m
at
ic
i S
.p
.A
.
ENGLISH
- Open the door with the
proper key, remove the
top dome and take out the
inspection door.
DX
5
6
7
&# &! &
SX
- Should installation on the right be
required, the direction of the bar’s
opening must be inverted. Proceed
in the following manner:
- remove the spring securing
bracket and the transmission rod
from the lever arm;
- loosen the motor support grub
screw;
- rotate the lever arm by 90°;
- Fix the spring securing bracket
and the transmission rod on the
side opposite that of lever arm;
- tighten the grub screw;
- invert the motor’s U-V phases and
the FA and FC endstop wires on the
control panel terminal;
5.5 Installation of the Unit
- The barrier is designed to be installed on the left of the gateway as seen from inside.
Lever arm
Transmission
rod
Spring securing bracket
Grub