background image

7

T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n p

rovi

d

ed

 i

n

 t

h

is

 m

an

u

al

 a

re to b

e c

o

n

si

d

er

ed

 s

u

sc

ep

ti

b

le to c

h

an

g

e a

t a

n

y t

im

e w

it

h

o

u

t w

ar

n

in

g

, by CAM

E c

an

ce

ll

i a

u

to

m

at

ic

i S

.p

.A

.

ENGLISH

- Open the door with the 
proper key, remove the 
top dome and take out the 
inspection door.

DX

5

6

7

&# &! &

SX

- Should installation on the right be 
required, the direction of the bar’s 
opening must be inverted. Proceed 
in the following manner:

- remove the spring securing 
bracket and the transmission rod 
from the lever arm;
- loosen the motor support grub 
screw;
- rotate the lever arm by 90°;

- Fix the spring securing bracket 
and the transmission rod on the 
side opposite that of lever arm;
- tighten the grub screw;
- invert the motor’s U-V phases and 
the FA and FC endstop wires on the 
control panel terminal;

5.5 Installation of the Unit

- The barrier is designed to be installed on the left of the gateway as seen from inside.

Lever arm

Transmission 
rod

Spring securing bracket

Grub

 

Содержание GARD 8 SERIES

Страница 1: ...G2081 G2081I AUTOMATION FOR STREET BARRIERS INSTALLATION MANUAL GARD 8 SERIES ...

Страница 2: ...bligatory for accesses of over 3 6m 003 ZG5 Electric board designed to accommodate radio board coupling 003 ZG6 Electric board designed to accommodate radio board coupling The following accessories are optional to the GARD 8 automation system 002 RSE Board for combined battery operation control and or compass for ZG5 control board 001 G02801 Flashing dome lamp 001 G02802 Support for mounting the p...

Страница 3: ...Parts description AUTOMATION UNIT ACCESSORIES VIEW FROM THE BAR SUPPORT BRACKET VIEW FROM INSPECTION HATCH 1 G02000 G04000 aluminium bar painted white Ø 100 mm 2 G02040 Ø40 yellow balancing spring 3 G04060 Ø50 green balancing spring 4 G06080 Ø55 red balancing spring 5 G02806 Rack 6 G02802 Support for DIR photoelectric cells 7 G02803 Luminous cord 8 G02807 Fixed barrier support 9 G02808 Mobile barr...

Страница 4: ...ctions inside the case made for protection circuit continuity are allowed as long as they include additional insulation with respect to other internal drive parts Install suitable tubes and ducts for electric cable passage to guarantee protection against mechanical damage Installation must be carried out by expert qualified personnel and in full observance of regulations in force 5 Installation 5 ...

Страница 5: ...cable 10 20 m Length of cable 20 30 m 230V 2F power supply FROR CEI 20 22 CEI EN 50267 2 1 3G x 1 5 mm2 3G x 2 5 mm2 3G x 4 mm2 230V motor power supply 3 x 1 mm2 3 x 1 5 mm2 3 x 2 5 mm2 Photoelectric cells TX 2 x 0 5 mm2 2 x 0 5 mm2 2 x 0 5 mm2 Photoelectric cells RX 4 x 0 5 mm2 4 x 0 5 mm2 4 x 0 5 mm2 24V power supply accessory 2 x 0 5 mm2 2 x 0 5 mm2 2 x 1 mm2 Control button 2 x 0 5 mm2 2 x 0 5 ...

Страница 6: ...ole to house the fixing base and prepare sheath tubes from the branch pit for the connections Remove the nuts and washers from the threaded screws position the cabinet on the base in correspondence with the 4 threaded screws and secure with the nuts and washers Note We recommend installing the cabinet with the inspection hatch facing the internal area Fill the hole with concrete and immerge the cl...

Страница 7: ...ed Proceed in the following manner remove the spring securing bracket and the transmission rod from the lever arm loosen the motor support grub screw rotate the lever arm by 90 Fix the spring securing bracket and the transmission rod on the side opposite that of lever arm tighten the grub screw invert the motor s U V phases and the FA and FC endstop wires on the control panel terminal 5 5 Installa...

Страница 8: ...ion the middle plate between the fitting plate and the bar fitting cover and put in one UNI 5931 M8x20 screw without tightening it to facilitate bar assembly Insert it in the bar s conduit a procedure that should be carried out on both sides Insert the shock resistant profile and cut excess length Lastly secure the bar end plug with the screws provided Insert the bar in the fitting cover and secur...

Страница 9: ...re bar rack Bare bar rack luminous cord Passage clearance lamp m 2 2 5 3 3 5 4 4 5 5 5 5 6 6 5 7 7 6 By Bare bar we mean a bar complete with the transparent slot cover and end plug 400 mm Prior to bar balancing select a suitable spring depending on the situation at hand See table below Tighten the anti shearing protection cover to the bar fitting with UNI6954 Ø3 9x19 screws 5 6 Bar balancing PASSA...

Страница 10: ...Release the gearmotor and position the bar vertically and then refasten the gearmotor Hook the tie rod to the anchoring racket Perform the same procedure if there is a second screw Insert the UNI5739 M12X70 screw into the spring securing bracket and tighten the UNI5588 M12 nut to the screw 1 2 Tighten the screw to spring 2 and the tie rod to the part underneath 3 4 ...

Страница 11: ...d refasten the gearmotor Note make sure the spring functions properly the spring is loose when the bar is in the vertical position at rest the spring is tight when the bar is in the horizontal position tense 5 7 Electric board installation Loosen the three screws in the container cover located in the upper part of the unit Insert the board in the container and fasten it with the screws provided ca...

Страница 12: ...ard carry out a series of steps to make sure of the bar s correct opening and closing positions and then if necessary proceed to the adjustment of the dampers Warning For greater safety and better unit performance the bar s opening and closing operations should be carried out with the inspection hatch closed Execute the closing operation adjust the open bar s position by turning the free damper cl...

Страница 13: ...g by CAME cancelli automatici S p A ENGLISH place back the inspection door 1 and the upper dome 2 Lock the door with the key After bar opening and closing adjustment tighten the locking nuts under the dampers After making adjustments and settings from the control panel put the container lid in place and secure with screws ...

Страница 14: ...detection with dipswitch The photoelectric cell does not react 12 23 24 9 Check if end stop opens The signalling LED indicator flashes rapidly 4 10 Check if end stop closes The signalling LED indicator remains on 13 11 Activate automatic closure dip switch The unit does not end its run 7 12 Check the correct direction of movement The bar is not properly balanced 7 15 13 2 3 2 4 2 7 command button ...

Страница 15: ...should therefore be removed and given to qualified service companies for proper disposal Prior to disposal it is always advisable to check specific regulations in force in the place of disposal PLEASE DISPOSE OF PROPERLY 7 Demolition and disposal MANUFACTURER S DECLARATION OF CONFORMITY Pursuant to annex II B of the Machinery Directive 98 37 EC CAME Cancelli Automatici S p A via Martiri della Libe...

Страница 16: ...Cod 119GT41 ver 1 0 06 06 CAME CANCELLI AUTOMATICI ...

Отзывы: