![background image](http://html1.mh-extra.com/html/came/g2080iz/g2080iz_installation-manual_486746031.webp)
p.
7
-
M
an
u
al
c
od
e:
11
9
G
U
4
0
11
9
G
U
4
0
v.
1
12
/2
0
14
© C
A
M
E c
an
ce
lli
auto
m
ati
ci
S
.p.
A
. -
Th
e d
ata a
n
d i
nf
or
m
ati
on i
n th
is
m
an
u
al
m
ay b
e c
h
an
g
ed at a
ny ti
m
e a
n
d w
ith
ou
t n
oti
ce
fr
om
C
A
M
E C
an
ce
lli
A
uto
m
ati
ci
S
.p.
A
.
Set up a foundation frame that is larger than the anchoring plate and sink it into the dug hole.
Fit an iron cage into the foundation frame to reinforce the concrete.
Assemble the four anchoring brackets to the anchoring plate.
Place the plate over the iron cage.
Fill the foundation frame with concrete. The base must be perfectly level with the bolts which are entirely above surface.
Wait at least 24 hrs for the concrete to solidify.
Remove the foundation frame.
Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts
Fit the electric cables into the tubes so that they come out about 600 mm.
Содержание G2080IZ
Страница 25: ...119GU40EN AUTOMATIC BARRIERS English EN Installation manual G2080Z G2080IZ...
Страница 49: ...119GU40FR BARRI RES AUTOMATIQUES Fran ais FR Manuel d installation G2080Z G2080IZ...
Страница 73: ...119GU40RU RU G2080Z G2080IZ...
Страница 79: ...7 119GU40RU 119GU40RU 1 12 2014 CAME Cancelli Automatici S p A CAME Cancelli Automatici S p A 24 600...
Страница 91: ...19 19 119GU40RU 119GU40RU 1 12 2014 CAME Cancelli Automatici S p A CAME Cancelli Automatici S p A...
Страница 94: ...22 22 119GU40RU 119GU40RU 1 12 2014 CAME Cancelli Automatici S p A CAME Cancelli Automatici S p A 6...