Applying the pillar bracket and A gate bracket
- Secure the pillar bracket to the pillar using M8 screws and ø14 mould inserts making sure the minimum distance of 100 mm from
the ground is met.
- Fix gate bracket “A” (with M6 screws or by welding) to the gate leaf making sure the measurements mentioned in the table on page
3 and the 68 mm uneveness between the two brackets are met.
Pillar bracket
Gate bracket “A”
INSTALLATION
⚠
The following illustrations are just examples, in that the space available for fitting the operator and accessories varies depending on the overall
dimensions. It is up to the installer to find the most suitable solution.
The drawing show an operator fitted on the left. Install the operator on the right, symmetrically.
Corrugate tube laying
Lay the corrugated tubes you will need for the cables coming out of the junction pit.
The number of tubes depends on the type of system and the accessories you are going to fit.
You need to lay two corrugated tubes where the operator is fitted.