background image

P

age 

14

 - Manual 

FA01795-EN

  - 03/2022 - © C

AME S.p.A. - The contents of this manual may be changed at any time and without notice. - T

ranslation of the o

riginal instructions

Fastening the operator in place

 Only fasten the operator after adjusting the pinion-rack coupling.

Fasten the operator to the anchoring plate using stoppers and nuts.

Determining the travel end points with mechanical limit switches

1

 Open the gate.

2

 Insert the opening limit-switch tab in the rack.

The spring must trigger the microswitch.

3

 Fasten the opening limit-switch tab using the grub screws supplied.

20

Содержание BXV04AGE

Страница 1: ...Sliding gate operators BXV04AGE BXV06AGE BXV10AGE INSTALLATION MANUAL FA01795 EN EN English...

Страница 2: ...Page 2 Manual FA01795 EN 03 2022 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...

Страница 3: ...e of the operator The electrical cables must pass through special pipes ducts and cable glands in order to guarantee adequate protection against mechanical damage The electrical cables must not touch...

Страница 4: ...imply follow these brief disposal guidelines DISPOSING OF THE PACKAGING The packaging materials cardboard plastic etc can be disposed of easily as solid urban waste separated for recycling Before dism...

Страница 5: ...weighing up to 400 kg that are up to 14 m long RAL7024 grey cover 801MS 0580 BXV06AGE Operator with 24 V motor featuring a control board with graphic display Adaptive Speed Torque Technology CXN BUS...

Страница 6: ...holder support 4 Fastening screw cover 5 Gearmotor 6 Anchoring plate 7 Mechanical limit switch 8 Transformer 9 Mechanical limit switch tabs 10 Housing for SMA sensors 11 Housing for two emergency bat...

Страница 7: ...al board for B1 B2 output 5 Connector for the RIOCN8WS module 6 Terminal board for BUS accessories 7 Connector for the CLOCK card 8 Memory Roll card connector 9 Terminal board for connecting the limit...

Страница 8: ...20 55 20 55 20 55 Storage temperature C 20 70 20 70 20 70 Thrust N 350 600 1000 Maximum operating speed m min 12 12 11 Cycles hour CONTINUOUS OPERATION CONTINUOUS OPERATION CONTINUOUS OPERATION Sound...

Страница 9: ...iant with 60227 IEC 53 IEC For power supplies up to 48 V you can use FROR 20 22 II cables compliant with EN 50267 2 1 CEI To connect the antenna use RG58 cable up to 5 m For paired connection and CRP...

Страница 10: ...minary operations Dig a hole for the foundation frame Set up the corrugated tubes needed for the wiring coming out of the junction pit Use 40 mm corrugated tubes to connect the gearmotor to the access...

Страница 11: ...plate in the iron cage The tubes must pass through the existing holes UNI 5734 12 UNI 5588 M12 Position the anchoring plate taking note of the measurements shown in the drawing If the gate does not h...

Страница 12: ...ntil they protrude by about 600 mm Setting up the operator Remove the operator cover Place the operator on top of the anchoring plate The electrical cables must pass under the operator foundation fram...

Страница 13: ...3 Weld or fasten the rack to the gate along its entire length To assemble the rack modules use an extra piece and rest it under the join then fasten it in place using two clamps Adjusting the pinion...

Страница 14: ...n place Only fasten the operator after adjusting the pinion rack coupling Fasten the operator to the anchoring plate using stoppers and nuts Determining the travel end points with mechanical limit swi...

Страница 15: ...ual may be changed at any time and without notice Translation of the original instructions 4 Close the gate 5 Insert the closing limit switch tab in the rack The spring must trigger the microswitch 6...

Страница 16: ...these must be intended exclusively for the power supply cable Thread the cables through the holes in the control board holder A The cables need to sit perfectly flush to the side of the operator as sh...

Страница 17: ...s you to connect up all compatible CAME devices Connection to the BUS can be in a chain star or mixed formation Once the system has been wired and after having set the address on each device the funct...

Страница 18: ...ivated during programming 2 Control device NO contact OPEN ONLY function When the HOLD TO RUN function is active the control device must be connected during OPENING 3 Control device NO contact PARTIAL...

Страница 19: ...Safety devices During programming configure the type of action that must be performed by the device connected to the input Connect the safety devices to the CX and or CY and or CZ and or CK inputs If...

Страница 20: ...e Safety devices test function 10 2 TX C NC TX 2 RX TX 10 TS 2 CX CY CZ CK 3P 4 7 3P 4 7 10 2 TX C NC TX 2 RX TX 10 TS 2 CX CY CZ CK 3P 4 7 3P 4 7 DXR DLX photocells Standard connection DXR DLX photoc...

Страница 21: ...uctions detected When the maximum number of detected obstructions has been reached the operator stops and an error message shows on the display There is at least one programmed timer A programmed time...

Страница 22: ...ctions Level 1 Level 2 Level 3 Level 4 Configuration Motor settings Opening direction Encoder Motor test Travel calibration Motor type Gate travel settings Opening speed Closing speed Opening slowdown...

Страница 23: ...Functions Hold to run B1 B2 output Removing obstacles Times Automatic close Automatic partial close Manage lights Passage open warning light Light E1 Courtesy time Pre flashing time BUS flashing beaco...

Страница 24: ...device status Manoeuvre counter Maintenance conf Maintenance reset Errors list Timer management Show clock Set the clock Automatic DST Time format Create new timer Open Start time End time Days of the...

Страница 25: ...tton moves the gate to the right The button moves the gate to the left Travel calibration Start the travel self learning Configuration Motor settings Travel calibration Motor type Set the type of gear...

Страница 26: ...omised The personalised values to be used are expressed as a percentage from 10 minimum thrust and high obstruction sensitivity to 100 maximum thrust and low obstruction sensitivity Slowdown AST contr...

Страница 27: ...test Activate deactivate test mode for impact tests With the function on the operator does not signal errors connected to obstacle detection after more than one consecutive impact Pre set the travel...

Страница 28: ...tive edges with 8K2 resistor Safety devices test Check that the photocells connected to the selected inputs are operating correctly after each opening and closing command Run the test by connecting th...

Страница 29: ...ocell BUS 8 Deactivated Default C1 Reopen while closing photocells C2 Reclose while opening photocells C3 Partial stop Only with Automatic close activated C4 Obstacle standby photocells C13 Reopen whi...

Страница 30: ...very half second when the gate is opening and stays on when the gate is open The light flashes every second when the gate is closing and remains off when the gate is closed Light E1 Choose the operati...

Страница 31: ...here is a BUS flashing beacon connected Configuration Manage lights BUS flashing beacon Closing colour White Default Yellow Orange Red Purple Blue Light blue Green Pre flashing colour BUS flashing bea...

Страница 32: ...y the board inserted in connector RSE1 If an RSE card configured for paired connections is plugged into the RSE_1 connector use the RSE_2 connector for remote connection CRP In this case a CAME KEY ca...

Страница 33: ...ard New user Register up to a maximum of 1000 users and assign a function to each one The operation can be carried out by using a transmitter or a BUS selector device e g a keypad or transponder reade...

Страница 34: ...ivating acquisition from a rolling code transmitter that has already been saved The saving and acquisition procedures are explained in the transmitter manual Manage users Rolling self learning Deactiv...

Страница 35: ...er of manoeuvres is the number shown multiplied by 100 Information Manoeuvre counter Total manoeuvres Manoeuvres performed since the operator was installed Partial manoeuvres Manoeuvres carried out af...

Страница 36: ...Sunday in October change to standard time Time format Choose the clock display format Timer management Time format 24 hour 12 hour Create new timer Time one or more types of activation chosen from th...

Страница 37: ...on only shows if a password has NOT been enabled Password Enable password Use the arrows and the Enter button to dial the desired code Enter the password again using the arrows and the Enter button to...

Страница 38: ...bration operations are deleted When using a CAME KEY device always update the board rmware to the latest version Import export data Save user data and system configuration data on a MEMORY ROLL card T...

Страница 39: ...he contents of this manual may be changed at any time and without notice Translation of the original instructions FINAL OPERATIONS Before closing up the casing check that the cable inlets are sealed t...

Страница 40: ...MASTER For information on connecting the electrics for the devices and accessories please see the ELECTRICAL CONNECTIONS section UTP CAT 5 max 1000 m RSE A B GND A B GND RSE A B GND A B GND Programmin...

Страница 41: ...Operating time error E9 Obstacle detected during closing E10 Obstacle detected during opening E11 The maximum number of obstacles detected consecutively has been exceeded E13 Limit switch input error...

Страница 42: ...Page 42 Manual FA01795 EN 03 2022 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...

Страница 43: ...Page 43 Manual FA01795 EN 03 2022 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...

Страница 44: ...ual may be changed at any time and without notice Translation of the original instructions AFFIX THE PRODUCT LABEL FROM THE BOX HERE CAME S p A Via Martiri della Libert 15 31030 Dosson di Casier Trevi...

Отзывы: