1)
2)
3)
4)
Pa
g.
7
-
Ma
n
u
al
c
od
e:
11
9
B
F
0
2
11
9
B
F
0
2
ve
r.
3
3
12
/2
0
1
6 © C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. -
Th
e d
ata a
n
d i
nf
or
m
ati
on r
ep
orte
d i
n th
is
in
sta
lla
tio
n m
an
u
al
a
re s
u
sc
ep
tib
le to c
h
an
g
e at a
ny ti
m
e a
n
d w
ith
ou
t o
b
lig
ati
on
o
n C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. to n
otify u
se
rs.
ENGLISH
Remove the form box (1), fi ll the pit around the cement block with soil (2) and unbolt the nuts and washers from the bolts (3). The
securing plate must be clean, perfectly aligned and with the bolt threads completely on the surface.
Insert the electric cables into the tubes until they exit about 400mm (4).
- Remove the cover from the gearmotor by loosening the side bolts, perforate the cable shafts using a screwdriver or a pair of
scissors and position the gearmotor atop the plate. Careful! The electric cables must pass through the cable shafts.
- Lift the gearmotor from the securing plate by about 5 to 10mm by using the threaded steel-levelling feet to allow any later
adjustments between the pinion and the rack.
Levelling feet
cable shafts