The Cab Floor
Procedure:
•
Consult the cab layout diagram in your final detail package to determine the orientation
of the floor
•
Place the cab floor on the sling arms
•
Orientate the floor as per your final cab layout diagram
•
Use the final cab layout diagram to set the clearances between the cab floor and each of
the landing(s)
•
Use the final cab layout diagram to set the clearances between the cab floor and each of
the other walls
•
Mark the centerline for the landing doors on the cab floor as per the final layout diagram
•
Use the centerlines to check the position of the bottom floor landing doors if they are
installed, if not, mark the centerline of the rough landing door opening and confirm the
door can be properly positioned within the opening and mark the exact location on the
floor of the opening
•
If the actual width of the shaft is not as per plans or your door locations are not located
where they should be, note the issues for now. Set the floor in the best possible position
for now. We will need to know any issues with the remainder of the shaft before we
decide what to do to resolve these issues
•
Attach the floor to the sling using 3/8-inch carriage bolts, washers, lock washers and
nuts mated through the slotted plates in the sling and car platform. Shim as needed to
ensure the floor is level
•
Leave the floor loose so you can check it at each landing when you are checking your
over travel and confirm the cylinder goes onto its hard stop
Содержание JOURNEY LU
Страница 1: ...INSTALLATION MANUAL JOURNEY LU LA ...
Страница 25: ......
Страница 27: ......
Страница 37: ...Adjusting the door with door tool Shim if required Installing the gibs ...
Страница 39: ...Hand Rail Mounting ...
Страница 40: ...Overview of Hoistway Part Location ...