Cab with two openings next to each other (known as a 90-degree cab)
•
Bring each full wall into the hoist-way and position it according to the label on the back
of the wall
•
Bolt each wall in place through the floor the bolts provided
•
If you have a return wall, set it in place in the opening and bolt it in place through the
floor and to the adjoining wall at the bottom
•
If you have a corner post bolt it to the floor
•
Move the cab (if necessary), in order to access the ceiling and inside the cab at the same
time
•
Bring the ceiling into the shaft and set it on the walls/post
•
Bolt the ceiling to each wall/post hand tight with bolts provided
•
Install the remaining bolts between walls 3 inches below and 17 inches below the
ceiling, hand tight
For every type of cab
•
Check that the cab is plumb on each side, shift the cab and hold it true
•
Tighten all the bolts
•
Check the cab is still true and each wall is plumb. If not, you may need to loosen some
or all the bolts, straighten the cab and retighten
Note: It’s important the cab is square and level before the cab is attached to the sling
in order to prevent the sling from being put under stress and causing premature wear
of the rollers
Содержание JOURNEY LU
Страница 1: ...INSTALLATION MANUAL JOURNEY LU LA ...
Страница 25: ......
Страница 27: ......
Страница 37: ...Adjusting the door with door tool Shim if required Installing the gibs ...
Страница 39: ...Hand Rail Mounting ...
Страница 40: ...Overview of Hoistway Part Location ...