Grounding and lightning protection
2-74
ptp-450 (July 2014)
Protection requirements on a high rise building
If the BHM is to be mounted on a high rise building, it is likely that cable entry is at roof level (
) and the
equipment room is several floors below (
). The following additional requirements must be observed:
The BHM must be below the lightning terminals and finials.
A grounding conductor must be installed around the roof perimeter, to form the main roof perimeter lightning
protection ring.
Air terminals are typically installed along the length of the main roof perimeter lightning protection ring
typically every 6.1m (20ft).
The main roof perimeter lightning protection ring must contain at least two down conductors connected to the
grounding electrode system. The down conductors should be physically separated from one another, as far as
practical.
Figure 20
Grounding and lightning protection on building