Network migration planning
2-32
ptp-450 (July 2014)
Deployment scenario 1 migration procedure
In Deployment scenario 1 migration procedure, it is presumed that that there are no temporary frequencies available
and that the PTP 450 BHMs will replace the existing BHMs.
Procedure 1a
Deployment scenario 1 migration procedure
1
Identify proximity to potential system interferers by running a spectrum analysis scan where the PTP
450 equipment is deployed. It is recommended to run this scan at several different times of day and
night
2
Record relevant BHM and BHS configuration parameters within the current operating network, if
applicable, including:
authentication, and authorization parameters
frequency configuration
data network configuration
RF statistics
security configuration
3
Configure the PTP 450 BHM and BHSs for deployment
4
Install the PTP 450 BHM
5
Install the PTP 450 MIMO(frequency A) BHSs – powered on
6
Verify BHS registration, link quality, and link performance.
7
Continue installation for frequency B sector and frequency C sector.
Содержание PTP 450 series
Страница 1: ...Cambium PTP 450 User Guide System Release 13 2...
Страница 20: ......