PTP 250 User Guide
Aligning antennas
phn-2510_002v000 (Mar 2012)
6-27
Aligning antennas
Before performing this task, check that hardware installation is complete (apart from the
network connections) at both the Master and Slave sites.
This task consists of the following procedures:
x
Starting up the units
on page
6-27
x
Checking that the units are armed
on page
6-27
x
Aligning antennas
on page
6-28
x
Aligning separate antennas for spatial diversity
on page
6-29
x
Monitoring received signal level
on page
6-29
.
x
Disarming the units
on page
6-31
Starting up the units
To connect one of the units to a management PC and start up both units, proceed as
follows:
1
Select the unit from which this process is to be controlled; either Master or Slave.
This is the ‘local’ unit.
2
Check that the management PC is connected to the local unit, powered up and
logged on.
3
Start the local unit.
4
Start the remote unit.
5
Log into the local unit as described in
Logging into the web interface
on page
6-6
.
Checking that the units are armed
Select menu option
Wireless Wizard
. The Wireless Configuration Summary page
is
displayed (
Figure 36
). If the arm/disarm button in the bottom right of the page contains
the text Select
Set Armed
, then select this option. This confirms that the units are armed
and ready for alignment.
Содержание PTP 250
Страница 1: ...Cambium PTP 250 User Guide System Release 250 02 01 ...
Страница 8: ...Safety and regulatory information VI phn 2510_002v000 Mar 2012 ...
Страница 20: ...List of Tables xii phn 2510_002v000 Mar 2012 ...
Страница 58: ...System management Chapter 1 Product description 1 30 phn 2510_002v000 Mar 2012 ...
Страница 104: ...Limit of liability Chapter 3 Legal information 3 12 phn 2510_002v000 Mar 2012 ...
Страница 122: ...Notifications Chapter 4 Reference information 4 18 phn 2510_002v000 Mar 2012 ...
Страница 152: ...Installing the PoE power supply Chapter 5 Installation 5 30 phn 2510_002v000 Mar 2012 ...