Chapter 3: System planning
Page 3-15
Site planning
•
If the tower is greater than 61 m (200 ft
)
in height, the drop cable shield must be grounded at the tower midpoint,
and at additional points as necessary to reduce the distance between ground cables to 61 m (200 ft) or less.
•
In high lightning-prone geographical areas, the drop cable shield must be grounded at spacing between 15 to 22 m
(50 to 75 ft
)
. This is especially important on towers taller than 45 m (150 ft).
For roof installations (
Figure 29
), use the following additional criteria:
•
The drop cable shield must be bonded to the building grounding system at its top entry point (usually on the roof).
•
The drop cable shield must be bonded to the building grounding system at the entry point to the equipment room.
Lightning Protection Unit(LPU) location
Find a location for the bottom LPU that meets the following requirements:
•
The bottom LPU can be connected to the drop cable from the ODU.
•
The bottom LPU is within 600 mm (24 in) of the point at which the drop cable enters the building, enclosure or
equipment room within a larger building.
•
The bottom LPU can be bonded to the grounding system.
Содержание PMP/PTP 450i Series
Страница 31: ......
Страница 47: ...Chapter 1 Overview of the PMP PTP 450 platform Page 1 5 Connectorized Use with an external antenna...
Страница 55: ...Chapter 1 Product description Page 1 13...
Страница 100: ...Chapter 2 System hardware Cabling and lightning protection Page 2 36 Cambium description Cambium part number...
Страница 118: ...Chapter 3 System planning Typical deployment Page 3 2 Chapter 3 Figure 28 Wall installation...
Страница 119: ...System planning Typical deployment Page 3 3...
Страница 120: ...Chapter 3 System planning Typical deployment Figure Page 3 4 29 Roof installation...
Страница 121: ...Chapter 3 System planning Typical deployment Figure Page 3 5 30 GPS receiver wall installation...
Страница 122: ...Chapter 3 System planning Typical deployment Figure Page 3 6 31 GPS receiver tower or mast installation...
Страница 123: ...Chapter 3 System planning Typical deployment Figure Page 3 7...