Chapter 3: System planning
Site planning
Page 3-14
External 60º sector
antenna – 5 GHz AP
0.066
6
11
17
25
34
External 90º sector
antenna – 5 GHz AP
0.083
8
14
22
31
43
SM
0.29
0.25
0.45
0.7
1
1.4
Table 48 PMP/PTP 450 wind loading (lb force)
Type of ODU
Max surface area
(square feet)
Wind speed (miles per hour)
80
100
120
140
150
External 60º sector
antenna – 2.4 GHz
AP
2.9
78
122
175
239
274
External 60º sector
antenna – 5 GHz AP
0.71
19
30
43
58
67
External 90º sector
antenna – 5 GHz AP
0.89
24
37
54
73
84
SM
0.29
7.8
12
18
23
27
Drop cable grounding points
To estimate how many grounding kits are required for each drop cable, refer to the site installation diagrams
(
Figure 27 , Figure 28
and
Figure 29
) and use the following criteria:
•
The drop cable shield must be grounded near the ODU at the first point of contact between the drop cable
and the mast, tower or building.
•
The drop cable shield must be grounded at the building entry point.
For mast or tower installations (
Figure 27
), use the following additional criteria:
•
The drop cable shield must be grounded at the bottom of the tower, near the vertical to horizontal transition
point. This ground cable must be bonded to the tower or tower ground bus bar (TGB), if installed.
Содержание PMP/PTP 450i Series
Страница 31: ......
Страница 47: ...Chapter 1 Overview of the PMP PTP 450 platform Page 1 5 Connectorized Use with an external antenna...
Страница 55: ...Chapter 1 Product description Page 1 13...
Страница 100: ...Chapter 2 System hardware Cabling and lightning protection Page 2 36 Cambium description Cambium part number...
Страница 118: ...Chapter 3 System planning Typical deployment Page 3 2 Chapter 3 Figure 28 Wall installation...
Страница 119: ...System planning Typical deployment Page 3 3...
Страница 120: ...Chapter 3 System planning Typical deployment Figure Page 3 4 29 Roof installation...
Страница 121: ...Chapter 3 System planning Typical deployment Figure Page 3 5 30 GPS receiver wall installation...
Страница 122: ...Chapter 3 System planning Typical deployment Figure Page 3 6 31 GPS receiver tower or mast installation...
Страница 123: ...Chapter 3 System planning Typical deployment Figure Page 3 7...