Page 5-1
Chapter 5:
Preparing for installation
This chapter describes how to stage and test the hardware for a 450 Platform network. This
chapter is arranged as follows:
Safety
on page
5-2
: Describes the precautions to be observed and checks to be performed
before proceeding with the installation
Preparing for installation
on page
5-5
: Describes the pre-configuration procedure before
proceed with installation.
Testing system components
on page
5-7
: Describes the procedures for unpacking and
performing and initial staging of the 450 Platform Family ODU.
Configuring Link for Test
on page
5-16
: Describes the procedures for testing the equipment’s
radio links.
Содержание PMP 450 Series
Страница 101: ...Chapter 2 System hardware GPS synchronization Page 2 40 Figure 25 Cluster Management Scenario 1...
Страница 125: ...Chapter 3 System planning Typical deployment Page 3 3 Figure 37 Wall installation...
Страница 126: ...Chapter 3 System planning Typical deployment Page 3 4 Figure 38 Roof installation...
Страница 127: ...Chapter 3 System planning Typical deployment Page 3 5 Figure 39 GPS receiver wall installation...
Страница 128: ...Chapter 3 System planning Typical deployment Page 3 6 Figure 40 GPS receiver tower or mast installation...